Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.11-10/1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 1 September 2010 Closing Report -TGmb Date: 2010-09-16 Authors:

Similar presentations


Presentation on theme: "Doc.: IEEE 802.11-10/1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 1 September 2010 Closing Report -TGmb Date: 2010-09-16 Authors:"— Presentation transcript:

1 doc.: IEEE 802.11-10/1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 1 September 2010 Closing Report -TGmb Date: 2010-09-16 Authors:

2 doc.: IEEE 802.11-10/1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 2 Abstract This document contains the TGmb closing report for September 2010.

3 doc.: IEEE 802.11-10/1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 3 Accomplishments One interpretation request received, see https://mentor.ieee.org/802.11/dcn/10/11-10-0992-01-000m-august- 2010-interpretation-request.doc https://mentor.ieee.org/802.11/dcn/10/11-10-0992-01-000m-august- 2010-interpretation-request.doc Completed LB167 Comment Resolution –7 Editorial, 9 Technical Met conditions for conditional approval to go to Sponsor Ballot –See https://mentor.ieee.org/802.11/dcn/10/11-10-0801-05-000m-tgmb-ec- approval-to-sb.ppthttps://mentor.ieee.org/802.11/dcn/10/11-10-0801-05-000m-tgmb-ec- approval-to-sb.ppt Scheduled Teleconference calls on Oct 15, 22, 29 2010 –10am Eastern (7am Pacific) Timeline Analysis

4 doc.: IEEE 802.11-10/1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 4 Mandatory Editorial Coordination IEEE SA staff performed MEC on P802.11REVmb D5.0, and indicated one mandatory change to be made prior to Sponsor Ballot (see https://mentor.ieee.org/802.11/dcn/10/11-10-1070-00- 000m-revmb-mec-comments.doc ). https://mentor.ieee.org/802.11/dcn/10/11-10-1070-00- 000m-revmb-mec-comments.doc This change was deemed editorial by the WG chair, and IEEE staff liaison, and P802.11REVmb D6.0, which includes this change, will be submitted to Sponsor Ballot. September 2010

5 doc.: IEEE 802.11-10/1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 5 Current TGmb Plan of Record May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests Acknowledge previous Task Group referrals Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot Nov 2009 – Recirc start July 2010 – Conditional Sponsor Ballot Approval from EC August 2010 – Form Sponsor Pool (45 days) – Closes Sept 14 September 2010 – Sponsor Ballot start – D6.0, Nov finish December 2010 – Sponsor Recirc. Start – (January-Feb) November 2011 – WG/EC Final Approval December 2011 – RevCom/SASB Approval

6 doc.: IEEE 802.11-10/1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 6 Goals for September - November Initial Sponsor Ballot

7 doc.: IEEE 802.11-10/1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 7 Motion Motion: Accept the interpretation response contained in https://mentor.ieee.org/802.11/dcn/10/11-10-0992-01- 000m-august-2010-interpretation-request.doc on the subject of AES-CCM test vectors and forward the response to the IEEE-SA for publication. https://mentor.ieee.org/802.11/dcn/10/11-10-0992-01- 000m-august-2010-interpretation-request.doc Moved: D. Stanley on behalf of the TG TG: Moved: Jon Rosdahl, Seconded: Harry Worstell Result: 11-0-0 Passes

8 doc.: IEEE 802.11-10/1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 8 References


Download ppt "Doc.: IEEE 802.11-10/1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 1 September 2010 Closing Report -TGmb Date: 2010-09-16 Authors:"

Similar presentations


Ads by Google