Presentation is loading. Please wait.

Presentation is loading. Please wait.

6 Gev tower = ~560 chns SMD adc:.62x 6,000/(560-120)/6 ~ 8.45 MeV/Chn ~ is consistent with original calibration! Center strip (GeV) Center strip (chn)

Similar presentations


Presentation on theme: "6 Gev tower = ~560 chns SMD adc:.62x 6,000/(560-120)/6 ~ 8.45 MeV/Chn ~ is consistent with original calibration! Center strip (GeV) Center strip (chn)"— Presentation transcript:

1 6 Gev tower = ~560 chns SMD adc:.62x 6,000/(560-120)/6 ~ 8.45 MeV/Chn ~ is consistent with original calibration! Center strip (GeV) Center strip (chn) Center strip (GeV) Center strip (chn) BSMD central strip to Tower ratio for eta and phi (from Ahmed analysis)

2 BEMC: Transverse Shower Shape from Electrons PHI PLANE SHOWER PROFILE Priscilla Kurnadi For 6 GeV electrons w/ ~ 6.6 MIP’s/GEV gives ~ 40 MIP’s in cluster ~ 24 MIP’s (62%) ~ 8 MIP’s ~ 1 MIP’s Profile from: With rough calibr of ~ 8.4 MeV/chn means single MIP ~ 18 chns vs. ped rms ~ 10 chns ???

3

4


Download ppt "6 Gev tower = ~560 chns SMD adc:.62x 6,000/(560-120)/6 ~ 8.45 MeV/Chn ~ is consistent with original calibration! Center strip (GeV) Center strip (chn)"

Similar presentations


Ads by Google