Presentation is loading. Please wait.

Presentation is loading. Please wait.

Pulp Mill Operator Training Class 3

Similar presentations


Presentation on theme: "Pulp Mill Operator Training Class 3"— Presentation transcript:

1 Pulp Mill Operator Training Class 3

2 Review Refiner Feed Tank 05-PF-001-001 Screen Feed Tank 05-PF-002-001
Washer stock and showers 05-PF Washer Vacuum and contols 05-PF

3 Process Flow

4 What haven’t we covered
Filtrate tank, WBL screen 05-PF MC Pump, Effluent Lift Station 05-PF Seal water, bathroom, etc 05-PF Showering pumps/ filter 05-PF Shower collection systems 06-PF Blow Tank NCG systems Consistency water tank 11-PF HD tower 12-PF Stock Prep Rejects

5 Filtrate Tank and System
1 Big Filtrate Tank 4 pumps off of it Blow tank dilution vfd(feeds refiner feed tank too) Screen dilution vfd Weak Black Liquor Transfer (to screen/recovery) Screen elutriation Fill it from washer showers (like current washers) Baffles inside to help foam and turnover Big tank, Startup volume will be important. A lot of large pipes to fill. Look at the flows and pressures for the pumps

6

7 Filtrate Tank Weak black liquor transfer pump to recovery
You have a small pressure screen on it, rejects go to the screen feed tank There is a bypass around it so the screen won’t shut pulp mill down There is a cheat line from the blow tank dilution over to the screen, so if you lose the transfer pump you can cheat off dilution to keep running Pressure screen is a miniature version of the big hot stock screens No longer go to the WBL tank in the pulp mill.

8 MC Pump Higher consistency than you currently do
High discharge pressure (200+ psi) Same size as OCC’s pump, upgraded rotating element. Vacuum pump impellar built into the pump Standpipe design, level indication VFD but not like you think. More set up for 3 main steps of flow (1 digester, 2 dig, 3 digs) See presentation

9 Shower Collection System
Washer needs clean water for 3 cleaning showers Washer needs hot water for 6th stage showers Washer needs about 1000 gpm for this purpose, that’s more than we have vacuum seal water MC pump needs a shot of flush water sometimes

10 Shower Collection System
To collect different water sources and to heat them, must take place in the pulp mill Collect them into a gravity strainer up high so it can drain into a tank Strainer in place of #3 unit chip hopper Accepts tank/ shower collection tank is in open area beside #4 L36 Rejects drain back into stock storage tank (ww tank) Vacuum seal water and WW feed into gravity strainer Mill supply backup, into the tank and discharge of the pump Drawings and video of strainer

11 Shower collection You have to heat the water to around 140oF (washing efficiency) Reuse all 3 spiral heat exchangers The water side will be this shower water collection The hot filtrate side will be Blow tank dilution There is a bypass (auto valve) if you are not getting enough blow tank dilution to the blow tank There is a bypass (manual) if you cant get enough water through for some reason Confusing piping and P&ID. Kind of like your coolers today

12 Shower Collection Cleaning shower filters in washer building Brochure
Cleaning shower has smaller nozzles, high pressure, needs cleaner water

13 Blow Tank, NCG Blow Tank gets an additional cyclone and a replacement Fiber separator NCG’s are pulled from all stock tanks in new building and piped to a steam ejector on pulp mill roof. Blow tank dilution feeds new cyclone flush, current cyclone like today, and new dilution valves on suction of pumps. Blow tank pumps get bigger motors and new impellars NCG P&ID

14 Consistency WW Tank Stock Storage Tank becomes the consistency water tank