Presentation is loading. Please wait.

Presentation is loading. Please wait.

N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N NPP DATA ACCESS Mitch Goldberg JPSS Program Scientist June 21, 2012.

Similar presentations


Presentation on theme: "N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N NPP DATA ACCESS Mitch Goldberg JPSS Program Scientist June 21, 2012."— Presentation transcript:

1 N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N NPP DATA ACCESS Mitch Goldberg JPSS Program Scientist June 21, 2012 1

2 N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N NESDIS Operations 2

3 N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N Calibration/Validation 3 Joint Polar Satellite System Four Phases of Cal/Val: 1.Pre-Launch; all time prior to launch – Algorithm verification, sensor testing, and validation preparation 2.Early Orbit Check-out (first 30-90 days) – System Calibration & Characterization 3.Intensive Cal/Val (ICV); extending to approximately 24 months post-launch – xDR Validation 4.Long-Term Monitoring (LTM); through life of sensors For each phase: – Exit Criteria established – Activities summarized – Products mature through phases independently We Are Here

4 N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N 4 Summary of Suomi NPP SDR Algorithm Schedule C CCCCCCCCC CC C C Sensor Beta Provisional (planned)Validated (planned) CrIS May 7, 2012September, 20122013 ATMS February 22, 2012September, 20122013 OMPS March 12, 2012December, 2012 2013 VIIRSMay 2, 2012December 20122013

5 N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N EDR Status (Calibration/Validation) Multiple levels of maturity -Beta – products are minimally validated; available to users to verify formats and parameters -Provisional – product quality may not be optimal; ready for operational evaluation -Validated – product performance is well for three different stages; ready for operational use Stage 1 - Product performance has been demonstrated to comply with the specification using a small number of independent measurements obtained from selected locations, periods, and associated ground- truth/field program efforts. Stage 2 - Product performance has been demonstrated to comply with the specification over a widely distributed set of locations and periods via several ground-truth and validation efforts. Stage 3 –Product performance has been demonstrated to comply with the specification and the uncertainties in the product well established via independent measurements in a systematic and statistically robust way representing global conditions. 5

6 N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N EDR Status (Selected Products) 6 Products Months after Launch 369121518212427303336 CrIS/ATMS Soundings VIIRS Clouds VIIRS Aerosols/Fire VIIRS SST VIIRS Snow/Ice VIIRS Ocean Color OMPS Ozone Beta Provisional Validated (Stage 1)Validated (Stage 2) 13 June 2012Current Projected Beta Declaration

7 N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N 7


Download ppt "N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N NPP DATA ACCESS Mitch Goldberg JPSS Program Scientist June 21, 2012."

Similar presentations


Ads by Google