Presentation is loading. Please wait.

Presentation is loading. Please wait.

January 12, 2012 1. Fairbanks PM 2.5 SIP Schedule 2 SIP DUE DATE ATTAINMENT DATE CURRENT DATE.

Similar presentations


Presentation on theme: "January 12, 2012 1. Fairbanks PM 2.5 SIP Schedule 2 SIP DUE DATE ATTAINMENT DATE CURRENT DATE."— Presentation transcript:

1 January 12, 2012 1

2 Fairbanks PM 2.5 SIP Schedule 2 SIP DUE DATE ATTAINMENT DATE CURRENT DATE

3 Upcoming Control Measure Analysis Effort planned over next 6-8 months Need to use technical models to inform the process and demonstrate attainment Work to analyze control options Costs/Benefits Dialogue with affected industries and local elected officials Determine and select a combination of controls to include in the plan Finalize the attainment projections and plan 3

4 Additional Options/Ideas to Reduce Air Pollution Local options Wood burning limits (sale of dry wood, etc.) Shift to #1 heating oil as Borough has Diesel retrofits Woodstove/OWB retrofits Energy conservation/efficiency programs Public Education 4 Note: List is not all inclusive

5 Additional Options/Ideas to Reduce Air Pollution (cont.) State options Wood burning limits (curtailment during episodes) OWB standards Limit wood cutting on public lands to only taking split wood Permitted industrial facility emission controls Large scale natural gas availability (e.g., pipeline) Federal options Tighter wood stove standards (technology forcing) National standards on fuels & equipment Additional funds for local programs 5 Note: List is not all inclusive

6 Additional Options/Ideas to Reduce Air Pollution (cont.) Need to find a mix of acceptable measures Local, state, federal Voluntary and regulatory measures Permanent reductions Short and Long Term 6

7 Next Steps? What technical studies/components are critical to understanding and analyzing controls? Need priorities for model development and operations Need platforms for assessing control strategies Need priorities for control strategies to analyze Assess programs implemented since base year Determine other measures or suites of measures to analyze Will need emission scenarios for control strategies Including temporal and spatial information


Download ppt "January 12, 2012 1. Fairbanks PM 2.5 SIP Schedule 2 SIP DUE DATE ATTAINMENT DATE CURRENT DATE."

Similar presentations


Ads by Google