Presentation is loading. Please wait.

Presentation is loading. Please wait.

Kitsap County SMP Work Group August 2, 2011. Shoreline Armoring - Outline Welcome – Introductions Background reading materials Existing Permit Process.

Similar presentations


Presentation on theme: "Kitsap County SMP Work Group August 2, 2011. Shoreline Armoring - Outline Welcome – Introductions Background reading materials Existing Permit Process."— Presentation transcript:

1 Kitsap County SMP Work Group August 2, 2011

2 Shoreline Armoring - Outline Welcome – Introductions Background reading materials Existing Permit Process (Kitsap County, WDFW) WAC Guidelines Photo Tour of County Shorelines Issues for Discussion: o New bulkheads o Repair / Replacement o Appurtenances o Incentives Breakwaters, Jetties, Groins Wrap up

3 Permit Process: Local Jurisdiction (Kitsap County) Washington Department of Fish and Wildlife Army Corps (if at or below Mean High Water)

4 WAC Guidelines [WAC 173-26-231(3)(a)] Shoreline Stabilization New development should be located to avoid need New structural stabilization shall not be allowed except: when necessary to protect existing primary structures for new and existing development under specific conditions ecological restoration projects, when determined necessary Geotechnical reports must address time frame (3 years) Must consider soft shoreline stabilization measures When allowed, must be at or near Ordinary High Water Mark, replacements included.

5 Issues: New Bulkheads Repair and Replacement Appurtenance Protection Incentives

6 Breakwaters, Jetties, Groins, and Weirs Only allowed where necessary to protect water dependent uses, public access, shoreline stabilization, or other specific public purpose. Require a Conditional Use Permit, except where installed to protect or restore ecological functions Provide for mitigation [WAC 173-26-201(2)(e)]

7 Wrap Up Summary will be e-mailed to Task Force Next Meeting: August 16 – Buffers


Download ppt "Kitsap County SMP Work Group August 2, 2011. Shoreline Armoring - Outline Welcome – Introductions Background reading materials Existing Permit Process."

Similar presentations


Ads by Google