Presentation is loading. Please wait.

Presentation is loading. Please wait.

Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University April 25 2012 KILC12 大邱廣域市 Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

Similar presentations


Presentation on theme: "Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University April 25 2012 KILC12 大邱廣域市 Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,"— Presentation transcript:

1 Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University April 25 2012 KILC12 大邱廣域市 Collaborators: V. Strakhovenko O. Dadoun, R. Chehab, A.Variola, L. Rinolfi, O. Dadoun,T.Kamitani, T.Suwada, T.Omori, J.Urakawa,K.Furukawa, K.Umemori,M.Satoh,T.Sugimura,S.Kawada, T.Akagi, Y. Uesugi

2 Contents Status of previous experiments – ~ same as LCWS2011 Temperature measurement 2012 January Prospects

3 experimental site KEKB LINAC Switch yard 8 GeV e- ~ nc/bunch upto 25Hz single bunch After the earthquake: beam recovered to 3GeV 8 GeV operation expected later half of 2012

4 Setup 8GeV e-1mm W crystal Sweeping Magnet 0.96T 0.75m amorphous W 8 mm 18 mm Analyzing magnet 5 ~ 30MeV

5 pictures e- 8GeV W Crystal on the goniometer Sweeping magnet

6 pictures movable stage amorphous targets thermocoupoles attached back end

7 The data Hybrid Conventional e 8GeV sweep mag 1mm W Crystal on axis (aligned to the beam) off axis (not aligned to the beam ) e 8GeV amorphous W 1.75, 3.5, 5.25, 8, 18mm temperature at the end of the targets by thermocouples and infrared camera positrons from the target momentum analyzed 

8 positron yield (arb. unit) angle of crystal axis w.r.t. beam (mr) rot. in vertical plain e sweep mag 8 mm Rocking curve same for horizontal rotation Preliminary factor 3 enhancement

9 e+ yield amorphous thickness [mm] e+ detected [a.u] P=20MeV Need simulation for analyzing the magnet collimator, detector to evaluate e+ yeilds

10 Detector acceptance Simulation of the is in progress by Y.Uesugi

11 Detector acceptance Simulation of the is in progress by Y.Uesugi

12 simulation in progress Preliminary 18 mm conventional agreement of data and simulation look fine low acceptance 0.0005e+/e- takes time for simulation

13 Temperature measurement w/ thermocouples back plane of amorphous target thermocouple approximately 1mm x 1mm to fast data logger read temperature each 10ms bunch by bunch temperature variation PEDD information by thermocouple temperature at equilibrium total energy deposit

14 Example of Temperature Measurement Temperature of the 8mm amorphous target for the hybrid case Time from Beam On (Minutes) Temperature (degree Celsius) Base temp. 23.3 ℃  T ~ 32 ℃ Preliminary

15 T vs total energy deposit hybrid on axis conventional 18mm 8mm T at equilibrium has information for total energy deposit except for 18mm hybrid target is thicker than shower max hybrid off axis T at equilibrium (deg) (simulation) (measured)

16 time, base T. adjustment 1sec

17 beam profiles crystalamorphous 3.2m  x=2.0mm  y=2.3 mm  x=0.42mm  y=1.54mm beam divergence  x ~ 0.5mr  y ~ 0.24mr PEDD estimation

18 bunch by bunch temp. dT provides a measure of PEDD hybrid on axis conventional hybrid off axis Simulation Measured

19 Making thermo couple array thermocouples temperature distribution of amorphous target bunch by bunch bases design in progress at Hiroshima

20 temperature measurement January 2012

21 temperature measurement

22 summary Systematic data for hybrid target R&D – yield from various target thickness – momentum 5, 10, 20 MeV – G4 Simulation in progress energy deposit/temperature – Thermocouple array works – in progress. G4 simulation is ready. – Systematic data in next experiments – ( but we need to wait for full recovery of KEKB LINAC)


Download ppt "Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University April 25 2012 KILC12 大邱廣域市 Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,"

Similar presentations


Ads by Google