Presentation is loading. Please wait.

Presentation is loading. Please wait.

DSEI-STE1 Developing Bikeways: Standards or Innovation? And Why Not Both? Marc Panneton Pro Walk / Pro Bike 2004 Victoria, BC.

Similar presentations


Presentation on theme: "DSEI-STE1 Developing Bikeways: Standards or Innovation? And Why Not Both? Marc Panneton Pro Walk / Pro Bike 2004 Victoria, BC."— Presentation transcript:

1 DSEI-STE1 Developing Bikeways: Standards or Innovation? And Why Not Both? Marc Panneton Pro Walk / Pro Bike 2004 Victoria, BC

2 2 Canadian jurisdictions in transportation FederalProvincial AirMaritimeRailRoad

3 3 Road Standardization l Normes – Ouvrages routiers in Québec –Road Design –Road Construction –Bridges and Structures –Roadside –Traffic Control Devices –Maintenance –Materials l Design and technical publications of the Transportation Association of Canada (TAC)

4 4 Bikeway standards 1990 1996 1999 2001 1992 Cycling Policy (1995) 2003

5 5 Comparative analysis of documents l Standards –what ought to be done –rigorous –liability –conservative –technical basis –used by transportation authorities l Guides –what can be done –flexible –references –innovative –comparative basis –used by small municipalities and organizations

6 6 Adoption Process Before 1999 l MTQ internal committees (one committee for each standards book) l Legislative process for adoption of amendments to the regulation under the Highway Security Code l Thematic tables open to partnership l The Highway Security Code refers to the standards published by the MTQ, thus symplifying amendments After 1999

7 7 Influence of guides on the standard adoption process Proposed amendment Analysis in committee : Unit producing the standards Units with the expertise External representatives RecommendationPublication of the update Need within the context of an MTQ project; Harmonization with VQ Technical Handbook; New geometric design. Presentation to the Committee : argument file; foreign examples; possible applications. Presentation of the new standard to the authorities (signature) 23 updates between 1999 and 2003

8 8 Example of positive influence 1996 1992 Adoption of Chapter 15 Bikeways after the Cycling Policy came into force in 1995

9 9 Example of positive influence 1999 1990 All bikeways traffic control devices, including : tourist signs service signs signal for cyclists and pedestrians Route verte signs

10 10 Example of positive influence 2003 2004 update l Definitions l Contra-flow bike lanes l Interregional destination signs

11 11

12 12 Photo taken in 1994

13 13

14 14

15 15 photo Mathieu Lamarre

16 16

17 17

18 18

19 19 Advantages of the approach l More flexibility in adopting and updating standards; l More design choices for project designers.

20 20 Disadvantages of the approach l Difficulty publishing off-prints (too frequent updates); l Possibility of introducing instability in the normative process.


Download ppt "DSEI-STE1 Developing Bikeways: Standards or Innovation? And Why Not Both? Marc Panneton Pro Walk / Pro Bike 2004 Victoria, BC."

Similar presentations


Ads by Google