Presentation is loading. Please wait.

Presentation is loading. Please wait.

Submission doc.: IEEE 11-13/0789r0 July 2013 Jon Rosdahl, CSR Technology Inc.Slide 1 802.11 Review of March 2013 Proposed Pars Date: 2013-03-18 Authors:

Similar presentations


Presentation on theme: "Submission doc.: IEEE 11-13/0789r0 July 2013 Jon Rosdahl, CSR Technology Inc.Slide 1 802.11 Review of March 2013 Proposed Pars Date: 2013-03-18 Authors:"— Presentation transcript:

1 Submission doc.: IEEE 11-13/0789r0 July 2013 Jon Rosdahl, CSR Technology Inc.Slide 1 802.11 Review of March 2013 Proposed Pars Date: 2013-03-18 Authors:

2 Submission doc.: IEEE 11-13/0789r0 July 2013 Jon Rosdahl, CSR Technology Inc.Slide 2 Abstract Review of 802 WG PARS submitted for review during the July 2013 Session.

3 Submission doc.: IEEE 11-13/0789r0July 2013 Jon Rosdahl, CSR Technology Inc.Slide 3 PARs under consideration July 1x-1x, 2013, Geneva, Switzerland 802.1Qcc - amendment for Stream Reservation Protocol (SRP), PAR and 5CPAR5C 802.1Qcd - amendment for Application Virtual Local Area Networks (VLAN) Type, Length, Value (TLV), PAR and 5C PAR5C 802.3br - amendment for Specification and Management Parameters for Interspersing Express Traffic, PAR and 5CPAR 5C 802.15.10 - recommended practice on Layer 2 Routing, PAR and 5C PAR5C P802.19.1 - PAR ExtensionPAR Extension

4 Submission doc.: IEEE 11-13/0789r0 802.1Qcc PAR In general the PAR is written by and for a community already knowledgeable in 802.1Q. One of the purposes of a PAR is to advertise the start of a new project to a broad community. 802.11 members can not read the PAR and determine the scope. Configuration stream wording is confusing What is the current stream limit. What will the new limit be? What types of layer three support do you plan to offer Do you plan to issue a press release if the project is approved. How would you describe the project in a press release? 8.1 is empty. Could some of the 5C material be used to further explain the project? 5C Technical feasibility What is the Avnu Alliance and what is its relationship to 802.1Q? Did Avnu supply use cases or requirements that could be refernced/made available? What does C mean? What assumptions are being made of 802.11 and its ability to participate in SRP? Slide 4Jon Rosdahl, CSR Technology Inc. July 2013

5 Submission doc.: IEEE 11-13/0789r0 802.1Qcd PAR Does IETF provide any similar VLAN tag? How does VLAN tag simplify mamnagemnt? 5C Slide 6 Please define the scope of “end stations” or provide some examples. The 5C alternately claims that Qcd will simplify network managemment and end station managem,ennt – which is it? Slide 5Jon Rosdahl, CSR Technology Inc. July 2013

6 Submission doc.: IEEE 11-13/0789r0 802.15.10 PAR Section 5.4 What L3 mechanisms are to be considered? Section 8.1 Clarify the relationship between 15.4e and 15.10. Are there any new functions being added by 15.10? Does 15.10 use only features previously defined by 15.4e? Is 15.10 for use only with 15.4 based networks? Should the project be called 802.15.10 or 802.15.4.1? 5C Slide 6Jon Rosdahl, CSR Technology Inc. July 2013

7 Submission doc.: IEEE 11-13/0789r0 802.3br PAR Is there any dependency between 802.1Qbu and 802.3br? Please explain what “interspersed express traffic” is. 5C Distict Identity (slide 5) What does close to zero delay on converged networks mean? Slide 7Jon Rosdahl, CSR Technology Inc. July 2013

8 Submission doc.: IEEE 11-13/0789r0 802.19.1 extension PAR Why is 802.11af not mentioned? 5C Slide 8Jon Rosdahl, CSR Technology Inc. July 2013


Download ppt "Submission doc.: IEEE 11-13/0789r0 July 2013 Jon Rosdahl, CSR Technology Inc.Slide 1 802.11 Review of March 2013 Proposed Pars Date: 2013-03-18 Authors:"

Similar presentations


Ads by Google