Presentation is loading. Please wait.

Presentation is loading. Please wait.

WINS Monthly Meeting www2.widener.edu/wins WINS Support (610) 990-8686 10/02/2008 www2.widener.edu/wins

Similar presentations


Presentation on theme: "WINS Monthly Meeting www2.widener.edu/wins WINS Support (610) 990-8686 10/02/2008 www2.widener.edu/wins"— Presentation transcript:

1 WINS Monthly Meeting www2.widener.edu/wins http://events.internet2.edu/index.cfm WINS Support (610) 990-8686 10/02/2008 www2.widener.edu/wins http://events.internet2.edu/index.cfm

2 Agenda Introductions Summer Upgrades Widener Summer Activity Summer District Activities ISP Update In-Line Content Filter Update PAIU Update WINS Contract Update Question & Answers

3 Introductions Name Title Location Welcome to WINS! Robert H. Hilinski - PRSBO Director of Information Technology Penn Delco School District

4 Summer Upgrades Nortel 8600’s from 4.1.1.0 to 4.1.5.4 Fortinet 3.0 Build 480 to 660 Aruba Wireless Upgrades Started Upgrades on July 7 th and finish by July 31

5 Widener Summer Activity On July 25 th, on the Widener LAN we changed our multicast routing protocol from DVMRP to PIM, with Nortel’s help. Outages occurred on Aug 1 st at 5:03 am, Aug 20 th at 10:15 am, Aug 21 st at 1:30 pm and Sept 2 nd at 3:35 pm. Nortel support engaged at all times. On Aug 21 st - PIM was removed and DVMRP was restored Sept 2 nd - Revealed code issue with Split MLT’s (not PIM) Sept 16 th – Moved Internet Router Gig connections off of ACN1 to reduce impact of future outages (10.1.1.200 DNS still dependent) Sept 24 th - Root cause discovered combo of Split MLT’s and Hot/Standby CPU’s – Nortel CR Q01908107-01 fixed in 4.1.8 available in Nov

6 Summer District Activities How did you spend your Summer? Challenges? Lessons learned?

7 ISP Update Yipes - 200 Mb NOW (Peak 130 Mb) SNIP – Moved to Chester now 100 Mb (Peak 50Mb) I2 - 30 Mb NOW (Peak 18 Mb)

8 ISP Update

9 In-Line Content Filter Update Bluecoat 800 Tested in Lab Upgrade from 4.2.4.5 to 5.2.3.3 to support Tagging Adding SSL Cert to content filter HTTPS traffic Purchased 3 ea SSL Modules Created HTTPS Layers Added sites to Bypass New 8100 Bluecoat Capital was approved, new box being shipped… DCIU Termination Letter Received - New box stopped shipment In-Line Caching on hold, best case Winter break with existing hardware

10 PAIU Update Currently the DCIU and Widener are discussing known options New options may be discovered No decisions have been made Review 5 Options

11 WINS Contract Update Peter Shoudy is working with the DCIU to come up with a mutually agreeable approach that will allow the contract to be renewed again when the current renewal expires June 30, 2009

12 Questions & Answers Next Meeting November 7th, 2008! GO FIGHTING PHILLIES!! Don’t forget to VOTE!!


Download ppt "WINS Monthly Meeting www2.widener.edu/wins WINS Support (610) 990-8686 10/02/2008 www2.widener.edu/wins"

Similar presentations


Ads by Google