Download presentation
Presentation is loading. Please wait.
Published byMartina Hines Modified over 8 years ago
1
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE
2
Course Wrap-up (new) 11/22FIT Holiday – Thanksgiving 11/27 26Construction Leadership & Ethics Ethics Paper, Kerzner Ch 8.5 11/28 27Course Wrap-up; review & critiqueNotebook turn-in 11/29 28Final Test & Critique 12/04 29 Study Day
3
Course review - I Project delivery process Pyramid analysis Responsibilities of parties Tour ongoing construction Conduct of operations Complexity of coordinating trades Impact of externalities Preconstruction operations Contract documents & order of precedence Specs & Drawings; use of standard specs Contract bid & award process Bonds
4
Preconstruction Operations Project delivery system Organization for construction… flow of activities Idea for project, hire designer, design concept, final design, cost estimate, contract documents, bidding process, select contractor, notice to proceed, pre- construction meeting, inspection of work, project turnover to owner. Roles of individuals… owner, designer, builder, PM, CM, owner’s rep Who has responsibility for quality control on a project? What is QA and what is QC. How do you verify that construction conforms to the design? Typical types of projects, traditional, design-build. Who hires the designer in each?
5
Course review - II Contract Administration Inspection process & Inspection Manual Submittal process Quality Control & Assurance Role of the resident engineer Contract scheduling Types of schedules & when used Use of MS Project Pyramid Schedule Disaster Recovery Construction Differs from normal Types of contracts used Skills you will need
6
Contract Documents Contract documents… drawings, specs, contract agreement Construction estimates what are the two types; conceptual & detailed.. when are they used and what is the accuracy of each What is the order of precedence of CDs If conflict between drawings & specs, which is followed. What are standard specifications and why should you use them
7
Contract Types & Uses Contracts – what are the types typically found – fixed price & cost plus When are these contracts used… what situations. Bidding process - what are the key activities in the process and what is the order How do you maintain equity in bidding Legal aspects of contracts, evidence Negotiations & disputes, how settled Risk and risk management, how allocated Bonds and insurance, types and use
8
Contracting… Letter contracts Cost plus contracts Unit price contracts Indefinite quantity contracts Design-build contracts Design contracts Fixed price contracts
9
Course review - III Construction operations… Scheduling – types & when used Use of MS Project – Pyramid schedule Construction operations Quality control Measurement & Payments Estimating Changes & Disputes Negotiating Laws & legal issues Value engineering Project closeout
10
Pyramid Construction…
11
Pyramid Schedule…
12
Construction Operations Site safety of construction… control of the site. Who can issue a stop work order. Shop drawings what are they and how used The inspection process Non-conforming work; how handled What are differing site conditions What is a change order Change order process What is the one-to-one concept of authority on a construction project Construction schedules what are the types… Project inspection; what is the process Value engineering; how used, where are savings
13
Contract inspection & supervision… Verify quantity & time of operations Manpower & equipment use Material quality & quantity Engineering sufficiency of work Quality of work Deviations from damage survey Negotiate claims for additional work Certification for occupancy
14
CVE 4070 Review for Test 3 Preconstruction Operations – Bidding Process Contract Documents Contract Types & Uses Construction Operations Scheduling Payments & Retention Estimating concepts & calculations Conceptual vs Detailed Methods Adjustments for time, location Escalation Value engineering Law for Engineers
15
Test #3… things to consider-1 Construction operations… Cost control Performance control Charting cost & performance Contracts & payments What is a contract Types of contracts… pros & cons, when used Progress payment process Problems with payments
16
Test #3… things to consider-2 Estimating… Definition Accuracy vs level of design Types of estimates – how calculated Time & location adjustments Scope, constructability, risk Estimating process Elements of cost Changes & extra work What is a change & claim Types of changes Change order process
17
Test #3… things to consider-3 Claims & disputes… What is a claim or protest What are owners responses What are contractor’s responses What are compensable or non-compensable claims What is acceleration, when used, who pays What methods are available to resolve disputes Contract termination
18
Test #3… things to consider-4 Law for Engineers… Basis for Laws Differences between engineering judgment & legal judgments Civilian Law vs. Public Law Torts & Contracts Damages & Compensation
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.