Presentation is loading. Please wait.

Presentation is loading. Please wait.

Software Project Management Final Project Presentation Team 02 – K 15 T 2.

Similar presentations


Presentation on theme: "Software Project Management Final Project Presentation Team 02 – K 15 T 2."— Presentation transcript:

1 Software Project Management Final Project Presentation Team 02 – K 15 T 2

2 Contents Click to add Title 1 Team Members Information 1 Click to add Title 2 Team Project Goals 2 Click to add Title 1 Changes and solutions 3 Click to add Title 2 Problems and solutions 4 Click to add Title 1 Team experiments want to share 5

3 Team Members Information NameStudent IDTSP Roles Tạ Quang Hiệp( Leader)T090363 Planning manager Support manager Trần Dũng ĐạtT095716 Implementation manager Trần Thị Ngọc TrâmT094907 Process manager Quality manager Đặng Nguyên ToànT095984Design manager Lê Trung HậuT093886Customer interface manager Test manager

4 Team Project Goals  Complete project on time  Become high-performance team and team members can:  Plan their works themselves  Manage and track projects to a successful conclusion  Produce quality products in less time  Achieve their best performance without the “death march” ending  In addition to building an effective team, the most important objectives is the quality of the product.  Get CMU certificate

5 Changes and solutions #ChangeSolutionsMitigates 1 Add life cycle of TSP process Team discuss approve life cycle Need content,quality team assignment management consider 2 Requirement : removing functions Change in scope and time. Change design project Verify sure requirement don’t change 3Architecture Design again entire project Verify sure requirement don’t change 4 Roles: DatTran add task: design detail. Progress quickly and support together Need indentify ability clear to everyone 5Work Packages Base on ability everyone, assign suitable about time, effort Verify sure requirement don’t change. Need identify ability clear to everyone 6 Change a goal time and product Approve to suitable requirement Verify sure requirement don’t change 7 Training skill for member: programming Break decide training(not enough time) Need arrange more time suitable 8Effort The effort on the project may change over time based on project complexity and scope of the project - Increase the level of interest in the work of the members. - Estimated reasonable time and effort of the staff working. 9EstimationThe first estimation have something don’t right, time, effort. - Use method to estimation exact

6 Problems and solutions #ProblemSolutions, Mitigates 1 Apply TSP process to team during project Team training together to understand process and application easily 2 Team member absent (sick,family problem) Team self-discuss to arrange task 3 GUI, code and diagrams (use case, sequence) don’t match with each other’s Have to fix one or two of them 4 Difficult in exchange information between team members Make a lot of meeting in yahoo…to exchange information encourage member go to school 5Don’t have sufficiency phone to test the project Borrow friend a phone to continue developed

7 Team experiments want to share  Need to have good communication between team members that will help team members get support from another when there are something hard in their work.  Know your team members abilities that will help a lot for team leader when assign tasks for members and help the progress more quickly.  Check your team members progress frequently, has deadline for each member’s task will avoid stretch the time to do.

8


Download ppt "Software Project Management Final Project Presentation Team 02 – K 15 T 2."

Similar presentations


Ads by Google