1 Chapter two ROAD TO DESIGN BUILD
2
2 ROAD MAP THE COST PLUS GUARANTEED MAXIMUM PRICE CONTRACT (GMP) CM PM DB IS THE LATEST STAGE: NEW PERSPECTIVE ON QUALIFICATIONS, A CLEAR DEFINITION OF THE PROJECT PROGRAM, PERFORMANCE SPECIFICATION, OWNER’S REPRESENTATIVE AND THE CONTRACT
3
3 PROCESS OD DESIGN BUILD COMPETITIVE BIDS IS DIFFERENT THAN DBB THREE ISSUES: ACCEPTANCE OF DESIGN, SCOPE OF WORK AND TOTAL COST RFP WEIGHTED CRITERIA METHOD-PTS SYSTEM ADJUSTED LOW BID THE EQUIVALENT DESIGN AND LOW BID A FIXED PRICE-BEST DESIGN APPROACH
4
4 DB ADVANTAGES AND DISADVANTAGES BRIDGING DESIGN APPROACH TO DB: DESIGN-DESIGN-BUILD, OWNER RESPONSIBILITIES, BRIDGING CONSULTANT AND DESIGN BUILD FIRM
5
5 HOW EFFECTIVE IS DB? DB VS DBB-SIZE PUBLIC VS PRIVATE INDUSTRIAL PROJECTS OVERALL-COST, SCHEDULE, SAFETY, CHANGES AND REWORK
6
6 ISSUES IN DB QUALITY: OWNERS/DP/ORGANIZATIONS