Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project R.O.M.P Status Report 24 th March, 2005. Team Evolution Team Evolution Project Status Project Status –Functional and Non Functional requirements.

Similar presentations


Presentation on theme: "Project R.O.M.P Status Report 24 th March, 2005. Team Evolution Team Evolution Project Status Project Status –Functional and Non Functional requirements."— Presentation transcript:

1 Project R.O.M.P Status Report 24 th March, 2005

2 Team Evolution Team Evolution Project Status Project Status –Functional and Non Functional requirements have been met. –Video Streaming sub-project progressing fast. –Still few enhancements such as coloring of the panels, and the fine tuning of the control. Time Lines Time Lines

3 Current Design Applet Frame Grabber http get request Taz.gif

4 New Design Applet MiddleMan Applet Thread Camera Thread Frame Grabber Data Buffer

5 Applet ConnHandler Applet ConnHandler List Video Writer Thread Iterate through list and send image to each applet. Video Connection Command Connection Video Streamer Thread Applet Frame Grabber sending frames Video (Middleman)

6 Usability Testing


Download ppt "Project R.O.M.P Status Report 24 th March, 2005. Team Evolution Team Evolution Project Status Project Status –Functional and Non Functional requirements."

Similar presentations


Ads by Google