Download presentation
Presentation is loading. Please wait.
Published byScarlett Lane Modified over 9 years ago
1
Summary Report Project Name: Infoway Message Builder API Brief Project Description: Intended to simplify the implementation of HL7 v3 messaging –Simulation component (accepts message, returns result from test data DB to sender) –A Generator component takes MIF files and creates canonical models of health messages, plus APIs for Java,.NET and simple XML –These allow application developers to work with business objects rather than HL7 v3 objects Major milestones to date: –Implementation of Java API versions completed (January 2011) –Implementation of.Net and Simple XML completed (April 2011) Projected milestones: –Test cases and test data prepared (Mar 2011) –End to end testing performed during (April 2011) –API packing under Open Source License completed (May 2011) –MBT course for Canadian jurisdictional implementers (Jun 2011) Major release dates: April 2011 Contribution date Contribution value ~ 2 person years (the deliverable levers the work and components of TL7 product)
2
Message Builder API Q3 2011 Boca Chart Content A Generator component accepts HL7 v 2.1.3 MIF files and creates canonical models of health messages APIs (for Java,.NET, XML) allow Developers to work with familiar business objects Multiple releases of standards are supported in a single set of generated code MR2009 (R02.04.02) MR2007 (V02R02) V02R01 V01R04.3 Need for course to accelerate the use of the tool by developer community Implementation complete for 3 platforms (Java,.NET, XML) June 2011 API available under Open Source License as of June 2011 Current version: 1.2 “Stimulus funding” must be spent in 3 years. Intense pressure to increase EMR adoption in physician offices Slow uptake of HL7 v3 messaging by application developers High learning curve to use HL7 v3 messaging Current version requires MIF 2.1.3 input and produces APIs for HL7 v3 ITS1.0 messaging Added Deleted & Changed Milestones Packaging Editions Dependencies Pressures Statistics.
3
12 Month Rolling Plan Major Dates and Deliverables 2Q10 4Q10 3Q10 1Q11 2Q11 Code released Implementation complete Field testing complete Roll out to Canadian developers License under Open Source
Similar presentations
© 2025 SlidePlayer.com Inc.
All rights reserved.