Extreme Light Infrastructure in Romania: progress Daniel URSESCU Technical contact point for ELI in Romania INFLPR, Magurele, Romania.

Similar presentations


Presentation on theme: "Extreme Light Infrastructure in Romania: progress Daniel URSESCU Technical contact point for ELI in Romania INFLPR, Magurele, Romania."— Presentation transcript:

1 Extreme Light Infrastructure in Romania: progress Daniel URSESCU Technical contact point for ELI in Romania INFLPR, Magurele, Romania

2 Design Criteria dual front-end (only one running at a time, 10-15 fs @100 mJ) 3 arms (energy up to 300 J each, before compression) separate room for pump lasers (first floor) high rep. rate experimental area (underground 1) and high energy experimental area (underground 2) extendable experimental area parallel experiments operation

3 First floor: pump lasers Ground floor: 2 x front-end laser and 3 x amplifiers Underground 1 and 2: experimental area Preliminary: ELI Nuclear Building

4 Laser Architecture 2xFRONT END DPSSL-pumped OPCPA FE1: 10-20 mJ BW > 120 nm T CP = 50 ps 0.1-1 kHz C > 10^12 FE2: > 100 mJ BW > 80 nm T CP = 1-2 ns 10-100 Hz C > 10^12 TEST COMPRESSOR AMPLIFIERS Ti:Sapphire pumped by ns Nd:YAG & Nd:Glass lasers A1 + A2 BOOSTERS > 4 J, 10Hz DIAGNOSTICS TARGETS DIAGNOSTICS BW – Spectral bandwidth, C – intensity contrast, T CP - chirped pulse duration, T C – re-compressed pulse duration, Φ – focused laser beam diameter, I Σ – intensity on target Φ = 1-20 μm I Σ = 3 x 10 23 -24 W/cm 2 BEAM TRANSPORT IN VACUUM TARGETS A3 +A4+ A5 POWER AMPLIFIERS >300 J A3 +A4+ A5 POWER AMPLIFIERS >300 J A3 +A4+ A5 POWER AMPLIFIERS >300 J A1 + A2 BOOSTERS > 4 J, 10Hz COMPRESSOR 200 J COMPRESSOR >200 J COMPRESSOR 200 J COMPRESSOR >200 J COMPRESSOR 200 J COMPRESSOR >200 J BEAM TRANSPORT IN VACUUM

5 Ground floor building description Technical rooms 2 x Front ends 3 x Amplification chains Adaptive optics, beam transport and diagnostics

6 First floor building description Technical rooms Pump lasers area Technical infrastructure area

7 Interaction Areas Front end target areas 3 PW high rep. rate target areas High energy target areas High energy compressors Beam delivery

8 Technical issues: laser system final pulse duration (>15fs) Spatial and temporal contrast coherent beam combination

9 Technical issues: experiments White book for experiments at ELI-NP Definition and calculation of the source terms for the experiments in the White Book Design of the target areas (including shielding)

10 Thank you for attention!