Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 INC Report to the NANC May 2002 David Bench - INC Moderator Rose Travers - INC Assistant Moderator.

Similar presentations


Presentation on theme: "1 INC Report to the NANC May 2002 David Bench - INC Moderator Rose Travers - INC Assistant Moderator."— Presentation transcript:

1 1 INC Report to the NANC May 2002 David Bench - INC Moderator Rose Travers - INC Assistant Moderator

2 2 INC MEETINGS June 3-7, 2002: INC 64 Portland, OR July 29-August 2, 2002: Montreal, Quebec, Canada September 9-13, 2002: Providence, RI All meeting information can be found at: www.atis.org/atis/clc/inc/inccal.htm

3 RELEVANT INC WEB SITES INC Homepage: http://www.atis.org/atis/clc/inc/inchom.htm INC Calendar: http://www.atis.org/atis/clc/inc/inccal.htm INC Issues: http://www.atis.org/atis/clc/inc/incissue.htm INC Meeting Records: http://www.atis.org/atis/clc/inc/incmtgrc.htm INC Published Documents: http://www.atis.org/atis/clc/inc/incdocs.htm

4 4 LNPA WORKSHOP PA contract inhibits timely changes to process improvements and is inflexible relative to the change order process The PA contract is based on the INC Guidelines/Forms in effect on Sept. 9, 2000. For example, the ability to add a “remarks” field on PAS mechanized forms is hampered by the change order process INC and PA continue to improve industry processes Some PAS upgrades require additional funding, such as adding a “remarks” field Frustration with implementing current change orders in PAS because state trial processes were more flexible

5 5 CO/NXX WORKSHOP INC discussed at length the input received from state regulators on Issue 322 - Removal of Switch ID. Although the issue remains in initial closure, INC has concluded that the Switch ID field should be removed because: FCC rules mandate assignments at the rate center level, not the switch level; Switch ID is an artifact from the days when assignments were made at the switch level and is no longer used in the assignment of a Central Office code; SPs may move numbers between switches within a rate center to balance resources, therefore rendering the original Switch ID moot; and State regulators have other ways to obtain Switch ID information, e.g., TRA, CCMI, NECA FCC Tariff No. 4 and other vendor products.

6 6 CO/NXX WORKSHOP NANC LNPA Working Group provided further clarification relative to PIMs 14 & 15 which the INC is working within Issue 364 - Modifications to Procedures for Code Holders/LERG Assignee Exit INC approved interim procedures for returning non-pooled codes with active or pending TNs (detailed in the NANPA report)

7 NANPE Workshop NANP Expansion Reference Document Final Closure expected at July INC meeting July NANC meeting precedes July INC meeting NANC briefing on Reference Document in September INC requests NANC members submit questions, in writing, prior to September meeting.

8 INC Issue Summary CICCO/NXXDMMLNPANANP Expansion NPA Active0126721 Initial Closure040801 *Resolved11545148150 *Tabled300001 *Withdrawn51489010 *TOTAL WS Issues 19846573363 Total Active Issues as of May 21, 2002 : 35 New Issues Since Last NANC Meeting: 5 Total Issues in Initial Closure as of May 21, 2002: 13 *Total Issues Resolved: 269 Issues With No National Agreements = 0 *Since INC Inception


Download ppt "1 INC Report to the NANC May 2002 David Bench - INC Moderator Rose Travers - INC Assistant Moderator."

Similar presentations


Ads by Google