Presentation is loading. Please wait.

Presentation is loading. Please wait.

Progress Report 2013/08/22. Model Modification Each core works under the same frequency due to hardware limitation. A task can have different processing.

Similar presentations


Presentation on theme: "Progress Report 2013/08/22. Model Modification Each core works under the same frequency due to hardware limitation. A task can have different processing."— Presentation transcript:

1 Progress Report 2013/08/22

2 Model Modification Each core works under the same frequency due to hardware limitation. A task can have different processing rates during its execution.

3 Observation 1 If there is only one task, the processing rate should remain unchanged. => w = 0 or 1 w 1-w

4 Processing rate According to observation 1, if there is only one task, the cost is: Assume that p j leads to the smallest cost. p j is independent with B.

5 Length of Overlapping Assume that tasks have different arrival time. Increase the processing rate of Task 0 during t 0 to t 1 reduces the overlapping of Task 0 and Task 1. Task 0 t1t1 t0t0 Task 1 Task 0 Task 1 t2’t2’t2t2

6 Length of Overlapping(Cont.) However, if p j is independent with B, the blue parts of Task 1 must have the same processing rate. Task 0 t1t1 t0t0 Task 1 Task 0 Task 1 t2’t2’t2t2

7 Queuing Theory Compute the average waiting time of tasks, and adjust the processing rate. CPU (1-p) p I/O λ μ

8 Concern Scheduling under “each core with the same frequency” makes our work no difference with the others.

9 Disccusion


Download ppt "Progress Report 2013/08/22. Model Modification Each core works under the same frequency due to hardware limitation. A task can have different processing."

Similar presentations


Ads by Google