Presentation is loading. Please wait.

Presentation is loading. Please wait.

WP1: DAUIN involvement Polito_DAUIN is involved in WP1 for 8,5 MMs Tasks:  T1.1 Review of end-user requirements and application scenarios  T1.5 Guidelines.

Similar presentations


Presentation on theme: "WP1: DAUIN involvement Polito_DAUIN is involved in WP1 for 8,5 MMs Tasks:  T1.1 Review of end-user requirements and application scenarios  T1.5 Guidelines."— Presentation transcript:

1 WP1: DAUIN involvement Polito_DAUIN is involved in WP1 for 8,5 MMs Tasks:  T1.1 Review of end-user requirements and application scenarios  T1.5 Guidelines for R&M design practices, including DfE (Design for Environment) T1.1:  Analysis of the state-of-the-art (hardware and software AR technologies)  Identification of users requirements and use cases (in collaboration with WIRES) T1.5:  Definition of guidelines for the implementation of the AR-based platform

2 WP1: DISAT involvement Polito_DISAT is involved in WP1 for 8 MMs Tasks:  T1.1 Review of end-user requirements and application scenarios  T1.2 Life data collection and analysis  T1.4 Life-cycle costing prediction and assessment  T1.5 Guidelines for R&M design practices, including DfE T1.1:  Identification of users requirements (in collaboration with WIRES) T1.2:  The use of diamond wires in stone cutting machines T1.4:  Life-cycle costing prediction and assessment focusing on materials T1.5:  Design for Environment (DfE) procedures focusing on materials

3 WP1: DIATI involvement Polito_DIATI is involved in WP1 for 7 MMs Tasks:  T1.1 Review of end-user requirements and application scenarios  T1.2 Life data collection and analysis  T1.4 Life-cycle costing prediction and assessment  T1.5 Guidelines for R&M design practices, including DfE T1.1:  Analyzing stone materials in their interaction with the cutting system T1.2:  Collecting the data during the stone cutting T1.4:  Assessing operating conditions T1.5:  Guidelines for the best use of the cutting system


Download ppt "WP1: DAUIN involvement Polito_DAUIN is involved in WP1 for 8,5 MMs Tasks:  T1.1 Review of end-user requirements and application scenarios  T1.5 Guidelines."

Similar presentations


Ads by Google