Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic.

Similar presentations


Presentation on theme: "Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic."— Presentation transcript:

1 Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic Management System

2 Todays Presentation Agenda Update on Traffic Signal System Operations & Engineering Support Contract Update on ATMS Phase I Overview of ATMS Feasibility Study Project Schedule & Progress ATMS Phase II – Future Funding

3 Update on Traffic Signal System Operations & Engineering Support Contract DRMP - to work on Best Practices for Regional Traffic Operations Optimization: – Regional Traffic Engineering Champion – Optimize Regional Signal Operations – Continue the Signal Retiming efforts – Manage and operate ATMS projects Advanced Traffic Management System

4 FDOT Financial Project ID 428058-52-01 Design-Build project 18 Intersections, fiber optic connection to signal controller and CCTV cameras Brent Lane & Bayou Boulevard from Highway 29 to 12th Avenue SR95 (N Palafox Street) from Brent Lane to Fairfield Drive Fairfield Drive from Texar Drive to North 9th Avenue Staff training completed in final test phase The ATMS Phase 1 Project

5 Monitors system-wide traffic conditions and devices Enables proactive management Empowers users with data, accessible via web enabled devices Ensures system integrity through data validation Centralizes documentation and inventory control The ATMS Phase 1 Project

6 Escambia/Santa Rosa Regional Advanced Traffic Management System Feasibility Study and Implementation Plan ATMS Study

7 City of Pensacola contracted with Atkins The results of this study will be used to develop a project or series of projects that will evolve the existing signal systems into a regional ATMS, and will identify immediate, intermediate, and future needs. ATMS Study

8 Notice to Proceed to Atkins: May 13, 2015 3 Stakeholder meetings in June & July Develop ATMS Phase II RFP by December Final Masterplan and Implementation Plan completed by June 2016 ATMS Study Schedule

9 Existing Conditions ATMS Framework ATMS Study Schedule

10 ATMS Implementation Plan Technology Review Develop ATMS Requirements TMC - Operations Implementation Plan & RFP Development

11 Meeting with FDOT October 22 nd – Provide Details on Masterplan to date – Discuss viable funding alternatives Develop Request for Proposal – Design Build for ATMS Phase II – Other deployment options ATMS Study

12 DRAFT ATMS Study DRAFT

13 Questions? Ben Faust, P.E. Advanced Traffic Management System