TMALL 0141 Presentation v 1.0 A concept for simplified Fixed Fire Fighting System: Northern link, Stockholm Ulf Lundström, TSO Swedish Transport Administration.

Similar presentations


Presentation on theme: "TMALL 0141 Presentation v 1.0 A concept for simplified Fixed Fire Fighting System: Northern link, Stockholm Ulf Lundström, TSO Swedish Transport Administration."— Presentation transcript:

1 TMALL 0141 Presentation v 1.0 A concept for simplified Fixed Fire Fighting System: Northern link, Stockholm Ulf Lundström, TSO Swedish Transport Administration

2 2

3 3

4 4 Northern Link: Part of ring road project 3,5 km long, in all 15 km of tunnels

5 5

6 6 Basic fire safety concept: Free flow traffic

7 7

8 8 Fresh air

9 9 2004: Southern Link opens for traffic: 100 000 vehicles /day, estimated 60 000. = Slow traffic

10 10 2004-2012: The tunnel closing when cogestion occurs.

11 11 2009 The safety concept of the Northen Link is uppdated in four aspects: Improved detection Improved traffic controll and management Improved message handling to users Fixed Fire Fighting System

12 12 Fixed Fire Fighting System in the Northern Link: Safety, not asset protection No traditional tunnel sprinkler Focus on cost effectivenes, robustnes and mantainability

13 13 Design solutions: Long sections (75 m) Low pressure, large droplets Extended coverage nozzles City water supply, no pumps Remtotely operated membrane valves Starts automatically at 90 C in heatdetection cable Protected against corrosion and freezing

14 14 FFFS in the project Northern link

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25 General data: Number of sections: 230 Total length: ca 15 km Investment cost: 72 Msek (7 M€) Investment cost per km: 5 Msek (0,5 M€) Experiences since nov 2014: No fires No false activations 100% availability 100% reliability (test once a year) No service or repairs required

26 26 Tests conducted in cooperation with SP Water distribution tests at different air speeds Visibility in a activated section Visibility from a moving car in a activated section Test of evacuation by foot through a activated section Fire tests: risk of fire spread between vehicles, 6 MW propan flame Activation in winter conditions (- 6 grader C)