Presentation is loading. Please wait.

Presentation is loading. Please wait.

JIRA tasks update Week 28 October – 4 November 2014.

Similar presentations


Presentation on theme: "JIRA tasks update Week 28 October – 4 November 2014."— Presentation transcript:

1 JIRA tasks update Week 28 October – 4 November 2014

2 Updated tasks SIM-147 – G.Folger SIM-147 o Documentation for HEP hadronic use cases and physics lists SIM-350 – J.Apostolakis SIM-350 o Create advanced TBB prototype using a workspace for each active worker SIM-440 – J.Apostolakis SIM-440 o Create test case for parameterisation which uses two or more types of solids SIM-457 – A.Ribon SIM-457 o Revision of hadron elastic scattering in physics lists SIM-473 – T.Nikitina SIM-473 o Create unit tests for Usolidss SIM-491 – V.Ivantchenko SIM-491 o Create a test of line shape for the decay J/Psi->mu+mu- SIM-502 – G.Folger SIM-502 o Failure in Binary Light Ion Cascade for deuteron projectile on a Hydrogen Target SIM-503 – T.Nikitina SIM-503 o Correct errors reported by optical-escape test for UMultiUnion, UExtrudedSolid and UCons/G4Cons

3 Completed/Closed tasks SIM-368 – J.Apostolakis SIM-368 o Redesign and optimise relevant multi-threaded split classes in the geometry modeler SIM-506 – V.Ivantchenko SIM-506 o Refinement of the de-excitation module providing sharing data between threads SIM-522 – G.Cosmo SIM-522 o New Geant4 10.0-patch03 required by CMS

4 Rescheduled tasks SIM-147 – G.Folger (10.0.Oct ➔ 10.0.Nov) SIM-147 o Documentation for HEP hadronic use cases and physics lists SIM-242 – G.Folger (10.0.Oct ➔ 2014/Q4) SIM-242 o Study the possibility to generate a traceback in case of crash of a test SIM-350 – J.Apostolakis (10.0.Oct ➔ 10.1.Jan) SIM-350 o Create advanced TBB prototype using a workspace for each active worker SIM-369 – J.Apostolakis (10.0.Oct ➔ 10.1.Apr) SIM-369 o Refactor G4Navigator to separate thread-dependent state SIM-374 – J.Apostolakis (10.0.Oct ➔ 2014/Q4) SIM-374 o Study possibility to change position of charged particle by multiple scattering process AlongStep SIM-382 – G.Folger (10.0.Oct ➔ 2015/Q1) SIM-382 o Create test(s) to check developments are G4MT compatible SIM-383 – G.Folger (10.0.Oct ➔ 2015/Q1) SIM-383 o Create test(s) to check for new static/global variables SIM-440 – J.Apostolakis (10.0.Oct ➔ 10.0.Nov) SIM-440 o Create test case for parameterisation which uses two or more types of solids

5 Rescheduled tasks - 2 SIM-457 – A.Ribon (10.0.Oct ➔ 10.0.Jan) SIM-457 o Revision of hadron elastic scattering in physics lists SIM-472 – T.Nikitina (10.0.Oct ➔ 10.0.Nov) SIM-472 o Enhance USolids testing SIM-473 – T.Nikitina (10.0.Oct ➔ 10.0.Nov) SIM-473 o Create unit tests for Usolidss SIM-493 – G.Folger (10.0.Oct ➔ Unscheduled) SIM-493 o Add coalescence to binary cascade SIM-502 – G.Folger (10.0.Oct ➔ 10.0.Nov) SIM-502 o Failure in Binary Light Ion Cascade for deuteron projectile on a Hydrogen Target SIM-507 – T.Nikitina (10.0.Oct ➔ 2015/Q1) SIM-507 o Enable comparison of different implementations of a Solid in a running LHC application SIM-518 – W.Pokorski (10.0.Oct ➔ 10.0.Nov) SIM-518 o Provide simplified calorimeter application running with Generic Physics lists.


Download ppt "JIRA tasks update Week 28 October – 4 November 2014."

Similar presentations


Ads by Google