Presentation is loading. Please wait.

Presentation is loading. Please wait.

3rd Meeting Matt Bernstein, Paul Capelli, Jared Segal November 20, 2008.

Similar presentations


Presentation on theme: "3rd Meeting Matt Bernstein, Paul Capelli, Jared Segal November 20, 2008."— Presentation transcript:

1 3rd Meeting Matt Bernstein, Paul Capelli, Jared Segal November 20, 2008

2 Accomplishments Preliminary syllabus research Meeting with X Follow-up meeting with David Lynn Project Schedule Requirements Draft Started

3 What is a syllabus? Paul has provided us with excellent outline Defines all the fields required to develop a syllabus Mentions ABET requirements Should work as good template to present to stakeholders

4 Discussion With David Lynn Followed up with David Lynn Need a version description Configuration description Installation and maintenance Well-commented code

5 Prototype Begun prototype construction Will be accomplished using Javascript, pre- developed syllabus Lightweight model will not include any back-end database interaction Will eventually be demonstrated to stakeholders

6 Prototype Progress Started on the student view Provides a listing of courses Login portion still required Additional views still in development Will be using prototype as framework for development Ideas for design will be taken from prototype

7 High Level Schedule High Level Schedule Produced Taken from a certain organization's “Custom Development Framework” Should provide high level guidelines for completing tasks in required timeframe Additional tasks can be added to separate.mpp file to document what we have performed

8 Website Will website be PHP accessible? If so, Matt has an open source PHP CMS to allow for the easy update of the website If not, we still need FTP, password, link to begin progress on our project website

9 Software Development Environment Hardware Procurement What is the state of server procurement? Apache Webserver installed on all of our local machines J2EE, MySql also installed on local machines Plan is to perform development on local machines until hardware (server) is procured

10 Requirements Documentation Will seek to develop requirements documentation over the break Hoping to complete a few more stakeholder interviews today Project schedule places final requirements due date on 12/8/2008 We are on schedule to complete this timeframe

11 Next Steps Begin draft of requirements document Continue Interviews of stakeholders Website Server procurement Complete Prototype Discussions with David Lynn of interfacing with Blackboard/Class Rolls/OASIS


Download ppt "3rd Meeting Matt Bernstein, Paul Capelli, Jared Segal November 20, 2008."

Similar presentations


Ads by Google