Presentation is loading. Please wait.

Presentation is loading. Please wait.

Collimation Working Group #137 Collimator Alignment Controls Patrick Bestmann20/02/2012.

Similar presentations


Presentation on theme: "Collimation Working Group #137 Collimator Alignment Controls Patrick Bestmann20/02/2012."— Presentation transcript:

1 Collimation Working Group #137 Collimator Alignment Controls Patrick Bestmann20/02/2012

2 Controls in March 2011 Some collimators have been identified to need re-alignment. Showing an angular misalignment >1.9mrad TCLA.A7R7.B1 TCTH.4L2.B1 TCSG.A5L3.B2 Reasons identified as: conflict with adjacent vacuum chamber Installation protection added on the support IR extremities, dead end extrapolation

3 Results dy dx ES All 3 collimators showed a rotation around the Z axis

4 Controls in January 2012 List of collimators to be controlled Beam 1 ---------- TCLA.B5R3.B1 TCSG.B5R3.B1 TCSG.A5R3.B1 TCSG.4R3.B1 TCTH.4L2.B1 changed due to X2ZDC Modifications TCTH.4L8.B1 TCSG.D4L7.B1 Beam 2 ---------- TCSG.A6R7.B2

5 Control of the Collimator alignment

6

7

8

9

10

11 Summary


Download ppt "Collimation Working Group #137 Collimator Alignment Controls Patrick Bestmann20/02/2012."

Similar presentations


Ads by Google