Presentation is loading. Please wait.

Presentation is loading. Please wait.

1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3.

Similar presentations


Presentation on theme: "1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3."— Presentation transcript:

1 1

2 2

3 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3

4 Technical consulting agency in the field of infrastructure Founded in 2011 Based in Breukelen, Utrecht Providing services to infrastructural market in the Netherlands Specialised in Maintenance Engineering, Asset Management and Life Cycle Management 1. Introduction 4

5 Mission High quality and sustainable advice on asset efficiency; Stay ahead of new developments; Providing practical solutions to achieve the goals of the client Vision Put proven theories into practice Distinguish from others: do not react but create. Goals To grow to become a prominent consulting agency within the maintenance sector To optimally support and unburden our clients 5 2. Mission, Vision, and Goals

6 RCM studies RAMSHE studies LCC analyses FME(C)As Strategical Maintenance concepts NEN2767 Condition inspections Contract/Project Management 3. Services 6 Systems Engineering Advice on Technical Tunnel Installations Life Cycle Management Advice on Acceptation and Embedding processes Education and Training Guidance in ISO 55000 Certification process

7 5. Network/Clients 7

8 Performance contracts: Design, Build, Finance and Maintain (DBFM) Contractor responsible for whole life-cycle of assets. 6. Changing Landscape: DBFM 8

9 Reward for Performance – Fines for unavailability of installations Insight in performance of assets crucial: Trade-offs in design on Costs vs Availability 9 7. Performance contracts

10 Function Breakdown Structure (FBS) 10 7. FBS vs SBS System Breakdown Structure (SBS)

11 Failure Mode, Effect, and Criticality Analysis 8. FMECA 11 1. Function 2. Function Fulfiller 3. Failure Mechanism 4. Cause of Failure5. Effect of Failure 6. Critcality of Failure 7. Control Measures 1.Function 2.Function Fulfiller 3.Failure Mehcanism 4.Cause of Failure 5.Effect of Failure 6.Critcality of Failure 7.Control Measures

12 9. Fault Tree Analysis 12

13 (Dutch: Dynamisch Route Informatiepaneel (DRIP)) 10. Case: Variable Message Sign 13 Function: Inform drivers by showing text/images

14 14 System Tree in PTC Windchill Quality Solutions

15 15 FMECA in PTC Windchill Quality Solutions

16 16 Fault Tree Analysis in PTC Windchill Quality Solutions

17 17 Fault Tree Analysis in PTC Windchill Quality Solutions Result: Failure Rate= 1.296e-5 /hour Mean Time to Failure: 77160 hour = 8.8 year

18 Thank you!


Download ppt "1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3."

Similar presentations


Ads by Google