Presentation is loading. Please wait.

Presentation is loading. Please wait.

Denes Talosi 20/03/2013.  Content Processing  Coordination  Non-Linear  MC-CE Op Gap analyzes.

Similar presentations


Presentation on theme: "Denes Talosi 20/03/2013.  Content Processing  Coordination  Non-Linear  MC-CE Op Gap analyzes."— Presentation transcript:

1 Denes Talosi 20/03/2013

2  Content Processing  Coordination  Non-Linear  MC-CE Op Gap analyzes

3 Long form Ingest/QC

4  Post Production ◦ Ingest ◦ QC ◦ Daytime edits ◦ Audio Conform ◦ Non-Linear production ◦ Formating ◦ Compliance view ◦ Segmentation ◦ Internal services (OAP, Digital, Marketing, Sales)

5  Coordination ◦ Shipping, Delivery ◦ Administration ◦ Task scheduling ◦ Contact playout, vendors, distributors ◦ Existing version acquiring ◦ Internal services (OAP, Digital, Marketing, Sales)

6  2700 acquired programing hours ◦ 80% HD – 50 Tbyte ◦ 20% SD – 12 Tbyte  2000 premier commercials /month  around 1800 promo cuts /month

7  Dub aquireing territories ◦ Czech 45% (600 hours/year) ◦ Hungary 50% (700 hours/year)  Other ◦ Poland (Voice over) ◦ Bulgaria (pending)

8  Subtitle only ◦ Romania ◦ Macedonia ◦ Serbia ◦ Croatio ◦ Slovenia ◦ Bulgaria  Sub insertion ◦ Hungary ◦ Czech

9 Content hits directly an editor for Technical QC Format conversion Content check (order etc) Removal of textless elements Reduction of blacks 4 x Edit station 3 x QC station

10

11  Catch Up production XRE render server to allow 24/7 ingest station availability

12

13

14 Shipping, Ingest, QC, Versioning, Delivery

15 ◦ Access database ◦ User based access ◦ Workflow selection (18 existing workflow templates) ◦ License and TX date workflow management ◦ Episode based title generation ◦ Deadline allocation for every episode ◦ Personal Task scheduling and prioritisation(ingest, QC traffic) ◦ Interactive status updates ◦ Multi level follow up for localization vendors ◦ Traffic coordination(follow up) ◦ Reporting (alert, vendor, red materials etc) Planned implementation of an SQL solution

16 E NTERING NEW SERIES

17

18

19

20 VOD/OTT/Catch Up

21 30,000 hours output yearly (60Tbyte, 250GB)  Catch Up  Classis Set Top Box VOD (AVOD, SVOD, TVOD)  OTT  BIVL  Mobile

22 Fully covers catch up needs With the delivery of 18,000 content per year.  BC/MPX ◦ Catch UP ◦ Mobile ◦ BIVL Metadata grabbing from Vision listing

23

24 7 platforms in operation Potential 46 platforms to launch 30-100 ph/ package with the avg. 300GB Challenges  Library management  Scheduling  Metadata  Content Production  Delivery

25  Existing resources covers up to 10 platforms  By September 20 platforms expected  Short term Solution needed

26  Production side ◦ HR (VOD operator) ◦ Production (storage 20T, Carbon Coder 57k USD)  Scheduling ◦ Access based solution (25k USD) ◦ Or/and HR (Planner)

27

28

29  Catch Up production

30 VOD Support Timing Number of platforms Refreshment Volume per month HR RequirementsTechnical SchedulingMetadata SDHDTotal* Phase 1As of Today 10 platforms to launch by the 1st of April 25050450 Covered (ingest editor, traffic coordinator) Covered (ProCoder- 8, XRE) Covered (Excel based) Phase 21st Jun 2013 20 platforms in operation 480120960 VOD Operator (annual)$24,000 Dedicated Storage, CarbonCoder$57,000 Access based$25,000 Covered with access Phase 3end of FY14 46 platforms in target 11042762208 Scheduler (annual)$24,000 Media Centre (Eagle)Vision 4.x *The production of one HD esset equals four SD output **the above calculation estimates that all platforms are capable for archiving ***30 ep per package ****20% of HD production ***** Both scheduling and production depends of the complexity of the platform. There is no linear calculation (platform exclusivity, pre rolls, subtitling etc )

31

32 CE Limitations, Benefits, Priorities

33 Major bottle neck is on the VOD side  Long form storage (archive and restore)  VOD scheduling and delivery  Remote ingest working storage (Source content pulling for a mid term storage)  1 Gig Bp-Lon connection

34  Source storage as a buffer to pull Cineshare – Aspera etc  Remote ingest  Implementation of Operations report functions into the MAMs  Asset Delivery (vendors, playout, non-linear)  Harding FPA test for TX ready contents  System integrations

35  Long Form Archive  Asset management  Receipt of Source contents to a buffer storage Integration (Vision)  VOD scheduling  Schedule driven multi platform transcoding  Automated Content Delivery (VOD, Playout, Studios etc)


Download ppt "Denes Talosi 20/03/2013.  Content Processing  Coordination  Non-Linear  MC-CE Op Gap analyzes."

Similar presentations


Ads by Google