Presentation is loading. Please wait.

Presentation is loading. Please wait.

Smart Agent Installation Required Customer Connections 5 Core Power Cable To Laser Head 1.Power To Laser Head 2.Ethernet 10/100 Connector 3.Mains Input.

Similar presentations


Presentation on theme: "Smart Agent Installation Required Customer Connections 5 Core Power Cable To Laser Head 1.Power To Laser Head 2.Ethernet 10/100 Connector 3.Mains Input."— Presentation transcript:

1 Smart Agent Installation Required Customer Connections 5 Core Power Cable To Laser Head 1.Power To Laser Head 2.Ethernet 10/100 Connector 3.Mains Input (Both Connectors must be connected to mains supply) 123

2 Smart Agent Installation Factory Connections These connections are for factory configuration and test only. 1.Serial Data Connection (NOT USED) 2.Power Connector (NOT USED) 3.Keyboard 4.VGA 5.Factory Ethernet 10/100 6.Serial Data Connection (NOT USED) 251 346

3 Smart Agent Multi Link Management Additional links can be managed via SmartAgent units by attaching a three wire serial cable between the PSU 24 of the link to be managed and the serial port shown above on the SmartAgent. To access the telemetry information from the SmartAgent for the new link, select link 1 from the options on the top of E-link manager screen when connected to the SmartAgent. Cable connections required from PSU24 to SmartAgent 9 Pin Female / Female - STRAIGHT 2 ------ 2 3 ------ 3 5 ------ 5 Optional second link management connection


Download ppt "Smart Agent Installation Required Customer Connections 5 Core Power Cable To Laser Head 1.Power To Laser Head 2.Ethernet 10/100 Connector 3.Mains Input."

Similar presentations


Ads by Google