Presentation is loading. Please wait.

Presentation is loading. Please wait.

ESA Report to DAI/IPR WG Gian Maria Pinna DAI/IPR meeting Toulouse 2-5 November 2004.

Similar presentations


Presentation on theme: "ESA Report to DAI/IPR WG Gian Maria Pinna DAI/IPR meeting Toulouse 2-5 November 2004."— Presentation transcript:

1 ESA Report to DAI/IPR WG Gian Maria Pinna DAI/IPR meeting Toulouse 2-5 November 2004

2 Products Metadata GFE MUIS Orders Data Producers Interactive User Services Master Catalogue Metadata Products Output products PFD Orders Production Orders AMS POH Processors Browses MUIS Browses Data Consumers CENTRAL INFRASTRUCTURE Multi-Mission Facility Infrastructure QC MMOHS Products Statuses SSE MMFI Elements

3 MMFI Deployment MultiMission Facility Infrastructure deployment is on-going Tape robotics installation completed in the 6 centres –STK Powderhorn 9310, with 2000 slots (400TB each, max 1.2 PB) –STK L700e, with ~700 slots (140TB) 8 TB NAS for data storage on line, accessed via AMS, and MMFI central data cache Fast disk arrays for AMASS cache (~1.2 TB) extensive testing, presently under deployment at remote facilities Documentation under completion (ADD, ICD, Technical Baseline Description)

4 HARM (Historical Archive Rationalization and Management) Transcription HW&SW from old media (D1, DLT) to AMS (StorageTek T9940B based) Orbits stitching (reducing overlap between acquisition stations) Rationalization in thematic archives SAFE (Standard Archive Format for Europe) –Based on previous experiences (Wilma, CEOS ICF, Cryosat) –XML metadata –Self-descriptive –Pointers to binary data structures –Draft 1.3 available for review (see SB’s presentation) –Efforts for XFDU compatibility Transcription of data on the AMS in original format started

5 FEOMI (Facility Evolution into an Open Multimission Infrastructure) Contract awarded and project started (KO: September, 9 th ) Porting of Envisat, ERS and TPM ground segments to MMFI Upgrade of mission specific elements to interface with MMFI Phase out of mission specific elements where same functionality can be ensured by MMFI elements Will bring to operations costs reduction starting from 2006 Phase 1 (User/System Requirements, AD) to be completed by end January 2005

6 Network rationalization and upgrade (LAN, WAN) Production LAN upgrades to Gbit under completion at all centres Networking our facilities with 34+ Mbps links via European academic network To be used for data circulation inside ground segments Also to be used to ensure better service to users for access to products on-line (automatic and transparent re-routing)

7 New EO Missions In line with Oxygen, all new EO missions will rely at various levels on the MMFI architecture and components –GOCE LTA development started –AEOLUS and SMOS LTA development to be started –SENTINEL missions concept under finalisation. Based on MMFI –New processing systems under development will have MMFI interface (e.g. new Linux-based Envisat processors)

8 GOCE LTA Architecture

9 PV -2004 “Ensuring the Long-Term Preservation and Adding Value to the Scientific and Technical Data” –5-7 October in ESRIN –37 papers –80+ registered participants

10

11

12

13

14 Future PVs? Lessons learnt –Parallel big workshop (IAC) in Vancouver –Similar conference (CODATA) one month later –CODATA meets every two years –Suggestion to make PV a regular venue on alternate years with CODATA Previous contacts with DLR to host PV-2005. Unfortunately they declined Looking for volunteering organizations


Download ppt "ESA Report to DAI/IPR WG Gian Maria Pinna DAI/IPR meeting Toulouse 2-5 November 2004."

Similar presentations


Ads by Google