14.10.2010Walter Werner, past president of DA11 Demolition in Germany A case study and update on demolitions developments in Germany.

Similar presentations


Presentation on theme: "14.10.2010Walter Werner, past president of DA11 Demolition in Germany A case study and update on demolitions developments in Germany."— Presentation transcript:

1 14.10.2010Walter Werner, past president of DA11 Demolition in Germany A case study and update on demolitions developments in Germany

2 14.10.2010Walter Werner, past president of DA21 Demolition in Germany Contents: –Demolition industry in Germany and the German Demolition Association –waste handling current state –technical trends machines explosives

3 14.10.2010Walter Werner, past president of DA31 Demolition in Germany Figures: total members of DA % number of companies ~ 1600 ~ 420 26 % number of employees ~ 10200 ~ 7200 71 % salaries in mio € ~ 236 ~ 167 71 % turnover in mio € ~ 1050 ~ 735 70 % company size: 2 – 250 employees most 15 – 20 employees

4 14.10.2010Walter Werner, past president of DA41 Demolition in Germany Figures: Demolition rubble 50 mio t –recycled31 mio t = 61.5 % –plaster based waste 0.3 mio t = 0.2 % –other construction waste 1.9 mio t

5 14.10.2010Walter Werner, past president of DA51 Demolition in Germany waste management - European frame guideline of waste management - not yet transformed totally into German law - is expected for mid of 2011 - Electronic proof of waste management - is law, but the computers do not yet work everywhere parallel paper and electronic registration = duplicated effort (= cost) - Decree of replacement of materials (recycling) - in development → open ended - because of federal structure up to 16 different regulations - decree about ground water must be modified

6 14.10.2010Walter Werner, past president of DA61 Demolition in Germany Technical trends machines: as in other countries: but we are still missing a ultra high reach hydraulic rig ( maximum now: 43 m) -operating license in preparation start expected 2011 EDA guideline will be considered

7 14.10.2010Walter Werner, past president of DA71 Demoition in Germany Dragline a 90 m boom is working capacity: up to 6 t complete hydraulic pipe system installed ~ 250 t

8 14.10.2010Walter Werner, past president of DA81 Demolition in Germany Explosives new trend: use of electronic detonators even for breaking up massive structures like air raid shelters

9 14.10.2010Walter Werner, past president of DA91 Demolition in Germany air raid shelter in the city of Lübeck,North Germany

10 14.10.2010Walter Werner, past president of DA101 Demolition in Germany “peeling” off 2/3 of the reinforced wall by blasting, rest demolished with concrete crusher

11 14.10.2010Walter Werner, past president of DA111 Demolition in Germany Vibrations German Standard DIN 4150 part 1: prediction/prognosis of vibrations part 2: comfort criteria: effects on persons in buildings part 3: effects on buildings/constructions

12 14.10.2010Walter Werner, past president of DA121 Demolition Vibrations: effects on persons in buildings: could become a problem effects on buildings: low limits, but standard in many European countries solution: install a vibration monitoring instrument → costs money, but saves a lot of trouble


Download ppt "14.10.2010Walter Werner, past president of DA11 Demolition in Germany A case study and update on demolitions developments in Germany."