Presentation is loading. Please wait.

Presentation is loading. Please wait.

End-to-End Efficiency (E 3 ) Integrated Project of the EC 7 th Framework Programme Reference network architecture Description of the Algorithm https://www.ict-e3.eu/

Similar presentations


Presentation on theme: "End-to-End Efficiency (E 3 ) Integrated Project of the EC 7 th Framework Programme Reference network architecture Description of the Algorithm https://www.ict-e3.eu/"— Presentation transcript:

1 End-to-End Efficiency (E 3 ) Integrated Project of the EC 7 th Framework Programme Reference network architecture Description of the Algorithm https://www.ict-e3.eu/ Dynamic Load-Management of Radio Resources Enrico BURACCHINI, Paolo GORIA, Alessandro TROGOLO Abstract: The last few years have seen the deployment of different RATs (Radio Access Technologies) covering the same geographical area at the same time. Such kind of deployment of different RATs coexisting temporally and geographically is giving the opportunity to network operators to jointly manage the resources, in order to adapt the network to the behaviour of the traffic and to globally maximize the capacity. Indeed, in a certain geographical area (e.g. a city) the offered traffic could be not uniformly distributed in time, in space and among RATs. This paper describes an algorithm for the Radio Resource optimization to be used in a network deployed with Reconfigurable Base Stations and experiencing a dynamic context such as the one introduced above. The aim of this algorithm is to give network operators a mean for optimally managing the radio and hardware resources among different RATs and increasing the overall capacity of the whole network. The paper presents also some preliminary performance results obtained by means of simulation. The reference network architecture considered in the study is characterized by a radio controller node inside the access network of a radio cellular system (e.g. BSC in the case of GSM system, or RNC in the case of UMTS system) and by one or more reconfigurable multi-RAT base stations BS1,…,BSk able to manage connections of different RATs at the same time node and built with a reconfigurable hardware pool (i.e. constituted by hardware/software reconfigurable transceiver modules shared between supported RATs). It is anticipated that RRM inside the controller has a new functionality called Hardware Reconfiguration Manager, devoted to monitor the current traffic status of the cells for each supported RAT, to execute the reconfiguration algorithm, to identify which base station(s) are to be reconfigured, to manage and control the reconfiguration process of the hardware resources in the reconfigurable base stations. The basic principle of the algorithm is to allow hardware resources to be dynamically re-distributed among different RATs and radio resources to be dynamically re-planned inside each RAT, according to traffic conditions and interference levels. In principle, when the traffic condition on one RAT increases and the blocking probability accordingly increases above a threshold, the algorithm evaluates the most appropriate action to be taken on the involved cells, in order to decrease (or cancel) the blocking percentage: -if the traffic situation allows it, the hardware resources devoted to other RATs could be reduced and the saved amount could be given to the RAT which has an increased blocking probability -the shifting of hardware resources from one RAT to another RAT involves to also reshape the planning of radio resources (e.g. frequency carriers) in the different supported RATs. The algorithm acts with the aim to keep the interference at an acceptable level, taking into account the first tier of cells of each involved cell. Preliminary results in UMTS scenario The UMTS scenario considered in the simulations is a macro-cellular layout with an ideal regular hexagonal coverage. Two hot-spots cells with heavy traffic (i.e. high blocking percentages is experienced) have been identified, while surrounding cells are less loaded (i.e. characterized by null blocking percentages). The algorithm reconfigures the base stations related to the hot-spot areas in order to decrease the blocking percentage, taking some resources from the less loaded neighbour cells. The preliminary performance results show the expected behaviour of the algorithm. In particular, the algorithm seems to be promising in the direction to give network operators a mean for optimally managing the radio and hardware resources and increasing the overall capacity of the whole network. Further investigations are expected in the future, such as the performance evaluation of a multi-RAT GSM/UMTS network and some evolutions of the algorithms taking into account the obtained results.


Download ppt "End-to-End Efficiency (E 3 ) Integrated Project of the EC 7 th Framework Programme Reference network architecture Description of the Algorithm https://www.ict-e3.eu/"

Similar presentations


Ads by Google