Transitional Committee for the Design of the Green Climate Fund – Workstream II Mandate – status of work, and work plan ecbi Seminar, Bonn 12th June 2011.

Similar presentations


Presentation on theme: "Transitional Committee for the Design of the Green Climate Fund – Workstream II Mandate – status of work, and work plan ecbi Seminar, Bonn 12th June 2011."— Presentation transcript:

1 Transitional Committee for the Design of the Green Climate Fund – Workstream II Mandate – status of work, and work plan ecbi Seminar, Bonn 12th June 2011

2 WORKSTREAM II - Mandate Building on the Cancun agreements, the Transitional Committee considered at its first meeting in April 2011, that work under this stream will include, inter alia: (i) Legal and institutional arrangements, including fiduciary management issues, for the establishment and operationalization of the GCF. (Annex IIII, Para 1(a)) (ii) Rules of procedure, functions, and responsibilities of the Board and other governance issues related to the Board. (Annex III, Para 1(b); Decision 1/CP.16, Para 103) (iii) Role of the Fund’s secretariat and the procedure for selection and/or establishing the independent secretariat. (Annex III, Para 1(f)) (iv) Trustee arrangements and issues of fiduciary responsibility for the Fund. (Decision 1/CP.16, Paras 104-108 ) (v) Relationship between institutional arrangements of the GCF and other bodies established under the Convention, including the Standing Committee on finance, as well as national entities. (Decision 1/CP.16;)

3 WORKSTREAM II - Sub-workstreams II.1 Legal Issues II.2 The Board II.3 The Secretariat II.4 The Trustee (interim and permanent) II.5 Issues of Complementarity and Coherence

4 WORKSTREAM II - Sub-workstreams II.1 Legal Issues The legal status (capacity or personality) of the GCF and its components, how such status will be conferred, and the possible liabilities of the components; The legal relationships between the GCF and its implementing partners, both multilateral and national; The accountability relationship between the UNFCCC COP and the GCF II.2 The Board The composition and election of the Board, including: the election of members and regional distribution among UN regions; the role of non- governmental actors; the election of Chair(s) and duration of membersí service; The mandate and responsibilities of the Board, especially the extent to which the Board will engage in project/programme approval; The rules of procedures and functioning of the Board, especially decision- making.

5 WORKSTREAM II - Sub-workstreams II.3 The Secretariat The establishment, as well as its legal status, composition, and recruitment; The mandate and functions, including its role (if any) in project/programme review, and MRV; Relationship with implementing institutions, including project cycles and division of responsibility II.4 The Trustee (interim and permanent) Issues regarding the role of the trustee (in addition to 1/CP.16, Paras 104-108), including the investment strategy of the trust fund; From where the trustee receives instructions; Relationship between the trustee and implementing institutions, particularly in relation to internationally accepted fiduciary standards; The review process for interim trustee and process for selection of permanent trustee.

6 WORKSTREAM II - Sub-workstreams II.5 Issues of Complementarity and Coherence The relationship between the GCF and the Standing Committee once constituted; Methods to ensure complementarity at the national and international level between the GCF and other bilateral, regional, and multilateral funding mechanisms and institutions as well as carbon markets; The specific relationship and complementarity with the GEF and Adaptation Fund within the UNFCCC financial mechanism. At the request of the TC and of the Co-Faciltators of workstream II, the Secretariat has prepared a number of background documents, inter alia factsheets on existing funds’ governance arrangements.

7 WORKSTREAM II - Workplan May 2011 Prepare and circulate draft workplan (draft circulated 25 May 2011); Prepare a factual background note of factsheets on relevant funds (draft circulated 26 May 2011); First Technical Workshop (30 May – 1 June 2011) Collect views on draft workplan finalise at first technical workshop; Collect views on key elements contained in workstream II at first technical workshop and through submissions (invitation for submissions sent 25 May 2011); Collect views on background note of factsheets and agree on possible further work June 2011 Prepare scoping paper based on views and submissions (before second TC meeting

8 WORKSTREAM II - Proposed Timelines Second TC meeting (July 2011) Identify options in consultation with TC Members based on scoping paper, background paper, and further inputs from TC Members; Second Technical Workshop (TBC 2011) Consolidate and reduce options in consultation with TC Members; Third TC meeting (TBC 2011) Table an options paper on entire workstream discussion for consideration by TC Members; Fourth TC meeting (TBC 2011) Reduce options within paper and finalise workstream II operational document(s) for COP

9 Transitional Committee - Further points TC attaches great importance to transparency and to involvement of observers, CSO  website http://unfccc.int/cooperation_and_support/financial_mechanism/green_clim ate_fund/items/5869.php  webcasting of TC meetings  participation of CSO at first TC workshop; submissions by CSO Despite big work load and very high pace, keep it a country/Party driven process Because of big work load and very high pace, make use of all relevant expertise and build on experience in existing institutions