Presentation is loading. Please wait.

Presentation is loading. Please wait.

PHOTOMOD 5.0 Dmitry Kochergin, Head of RACURS Technical support department October 2009, Attica, Greece New level of automation and productivity!

Similar presentations


Presentation on theme: "PHOTOMOD 5.0 Dmitry Kochergin, Head of RACURS Technical support department October 2009, Attica, Greece New level of automation and productivity!"— Presentation transcript:

1 PHOTOMOD 5.0 Dmitry Kochergin, Head of RACURS Technical support department October 2009, Attica, Greece New level of automation and productivity!

2 PHOTOMOD 5.0. Main advantages new AAT reliable and precise correlation algorithm up to 20 000 images in the project no limits for the image size full 16-bit rasters support “dynamic” rebuilding of TIN and contours while editing   new user-friendly interface of tie points manual measurements   block layout from the Exterior Orientation Parameters   direct working with the “source” images   DTM of any size   no “fixed” stages of working with the project   stereo-processing of “any” pair of images   more and more distributed processing   more system openness and reliability   optimal using of modern video cards benefits   powerful 3d window   raster bands managing on any stage of processing   simultaneous access of several operators to the AT-project   WorldView stereoprocessing   and more…

3 PHOTOMOD 5.0. Automatic Aerial Triangulation terrain: mountains, forest number of images: 629 camera: DMC pixel: 12 mkm / ~ 15 cm GSD processing time: 20 hours 4 minutes

4 PHOTOMOD 5.0. Automatic Aerial Triangulation terrain: low urban number of images: 762 camera: UltraCamX pixel: 7.2 mkm / ~ 40 cm GSD Processing time: 5 hours 16 minutes

5 PHOTOMOD 5.0. Automatic Aerial Triangulation PHOTOMOD 4.4: problems in measurements in the strips junctions

6 Measurements in PHOTOMOD 5.0 PHOTOMOD 5.0. Automatic Aerial Triangulation

7 PHOTOMOD 4.4: problems with measurements “in the forest” Measurements in PHOTOMOD 5.0

8 PHOTOMOD 5.0. Automatic Aerial Triangulation PHOTOMOD 4.4 problems:

9 PHOTOMOD 5.0. Automatic Aerial Triangulation no problems in PHOTOMOD 5.0

10 PHOTOMOD 5.0. Уравнивание синтетического блока из 10 000 изображений

11 PHOTOMOD 5.0. new interface of “manual” tie measurements

12 PHOTOMOD 5.0. Block layout from exterior orientation parameters

13 PHOTOMOD 5.0. “Source” images with a point measurements

14 PHOTOMOD 5.0. Images oriented in accordance with block layout

15 PHOTOMOD 5.0. QuickBird images > 20 gigabytes

16 PHOTOMOD 5.0. Block with “big” overlap areas

17 PHOTOMOD 5.0. Stereopair from any overlapping strip images

18 PHOTOMOD 5.0. Stereopair from different strips overlapping images

19 PHOTOMOD 5.0. TIN and breaklines New breaklines embedding algorithm PHOTOMOD 5.0 PHOTOMOD 4.4

20 PHOTOMOD 5.0. TIN and contour lines “Dynamic” contoursFinal smooth contours

21 PHOTOMOD 5.0. Distributed processing

22 PHOTOMOD 5.0. DEM (> 10 gigabytes)

23 RGBI image processing

24 PHOTOMOD 5.0. 3D window

25 PHOTOMOD 5.0. 3D objects to be exported to AutoCAD

26 PHOTOMOD 5.0 Thank you for attention !


Download ppt "PHOTOMOD 5.0 Dmitry Kochergin, Head of RACURS Technical support department October 2009, Attica, Greece New level of automation and productivity!"

Similar presentations


Ads by Google