Presentation is loading. Please wait.

Presentation is loading. Please wait.

August 99 E.Auffray CMS/ECAL STATUS on PWO crystals from Bogoroditsk after one year of preproduction for CMS-ECAL Etiennette Auffray SCINT 99, 16 August.

Similar presentations


Presentation on theme: "August 99 E.Auffray CMS/ECAL STATUS on PWO crystals from Bogoroditsk after one year of preproduction for CMS-ECAL Etiennette Auffray SCINT 99, 16 August."— Presentation transcript:

1 August 99 E.Auffray CMS/ECAL STATUS on PWO crystals from Bogoroditsk after one year of preproduction for CMS-ECAL Etiennette Auffray SCINT 99, 16 August 1999

2 August 99 E.Auffray CMS/ECAL Importance of R&D effort 95 98

3 August 99 E.Auffray CMS/ECAL Since the 4th September 98, we received : 1000 preproduction crystals from BTCP: 100 : 04/09/98 100 : 03/11/98 200 : 08/12/98 200 : 22/03/99 400 : 22/06/99 All have been visually Inspected All have been characterised with ACCOS (Automatic machine to measure : 3D, transmission, decay time,LY ) Some have been irradiated 61 irradiated in High dose rate (500Gy, 240Gy/h) 129 irradiated in Low dose rate (3Gy, 0.15Gy/h) 400 used for the 1st module of CMS/ECAL in CERN/lab27 regional center First crystals La doped & progressively changed to Y-Nb doped

4 August 99 E.Auffray CMS/ECAL Reception of first 100 preproduction crystals

5 August 99 E.Auffray CMS/ECAL Quality check of first 1000 preproduction crystals

6 August 99 E.Auffray CMS/ECAL Optical Specifications for Preproduction  Longitudinal transmission  10% at 350nm  55 % at 420nm  65 % at 600nm  Transversal transmission –For T=50%   6nm  S >1.5 %/nm between 340 and 370nm  For “blue” crystals : LY in labo27 at 8X o  8 pe/MeV 2 pe/MeV with 1 EG&G APD (BT97)  Decay time LY(100ns)/LY(1  s) > 90% No visible afterglow »< 0.5% background with 1MBq source in standart decay time measurement Good radiation Hardness

7 August 99 E.Auffray CMS/ECAL Bogoroditsk Preproduction Status 16 August, 99  1500 crystals delivered Mid of August 199819992000

8 August 99 E.Auffray CMS/ECAL Dimensions AR-Nominal value Batch 1 19/100 rejected 19% On all dimensions Batch 2 14/100 rejected 14% Batch 2 19/200 rejected 8.5% -100  00

9 August 99 E.Auffray CMS/ECAL Dimensions AR-Nominal value Batch 4 8/200 rejected 4% On all dimensions Batch 5 9/400 rejected 2.25 % -100  00

10 August 99 E.Auffray CMS/ECAL 420nm Optical Transmission Distribution for 1000 crystals 3.2% below 55%

11 August 99 E.Auffray CMS/ECAL 420nm Optical Transmission Batch 1 11/100 rejected 11% Batch 2 6/100 rejected 6% Batch 3 15/200 rejected 7.5%

12 August 99 E.Auffray CMS/ECAL 420nm Optical Transmission Batch 4 0/200 rejected 0% Batch 5 0/400 rejected 0%

13 August 99 E.Auffray CMS/ECAL Light Yield Distribution for 1000 crystals LY at 8X o 2.2% below 8pe/MeV

14 August 99 E.Auffray CMS/ECAL Light Yield 0/100 rejected 0% 0/100 rejected 0% 1/200 rejected 0.5% Batch 3 Batch 2 Batch 1

15 August 99 E.Auffray CMS/ECAL Decay time Distribution for 1000 crystals % of emitted light in 100ns

16 August 99 E.Auffray CMS/ECAL The slope of longitudinal transmission between 340nm & 370nm

17 August 99 E.Auffray CMS/ECAL The slope of longitudinal transmission between 340nm & 370nm 0.1% below 1.5%

18 August 99 E.Auffray CMS/ECAL Radiation damage certification of Russian crystals  Irradiation of ingot’s top and bottom parts –All crystals –At Bogoroditsk –To control radiation hardness uniformity  High dose & dose rate side irradiation (induced absorption at all ) –Sampling (20%) –At Bogoroditsk after March 99 –To control absolute radiation hardness and uniformity  Transverse transmission along the crystal –All crystals –At Bogoroditsk and at CERN –To control doping uniformity  Longitudinal transmission band edge slope –All crystals –At Bogoroditsk and at CERN –To predict radiation hardness  High dose & dose rate side irradiation (induced absorption at all ) –Sampling (20%) –At Geneva hospital (CERN) – To control absolute radiation hardness & uniformity  Low dose rate front irradiation (LY loss) –Sampling (20%) –At CERN (TIS) –To control radiation hardness in LHC conditions  Low dose rate side irradiation (transmission loss at ≠ ) –Sampling (20%) –At CERN (X5) –To control radiation hardness uniformity

19 August 99 E.Auffray CMS/ECAL Sampling irradiation tests Batch 3 & 4 Front irradiation 0.15Gy/h

20 August 99 E.Auffray CMS/ECAL Radiation Hardness Lateral irrad., 500Gy, 240Gy/h Front irrad., 1.5Gy, 0.15Gy/h

21 August 99 E.Auffray CMS/ECAL Status of crystal delivery from Bogoroditsk (Russia) 199819992000 1000 crystals delivered 28 May 1999

22 August 99 E.Auffray CMS/ECAL Conclusion Ramping up in production rate according to plans Continous improvement of the crystal characteristics from batch to batch : Improvement of dimensions Improvement of the transparency (no more core defect) Exceptional rejection for bad radiation hardness The results on first 1000 preproduction crystals are very encouraging


Download ppt "August 99 E.Auffray CMS/ECAL STATUS on PWO crystals from Bogoroditsk after one year of preproduction for CMS-ECAL Etiennette Auffray SCINT 99, 16 August."

Similar presentations


Ads by Google