Presentation is loading. Please wait.

Presentation is loading. Please wait.

Connectathon Test Development 101. Connectathon Timeline SepNov Register Pre-connectathon testing Test evaluation Config entry Connectathon!AugOctDecJan.

Similar presentations


Presentation on theme: "Connectathon Test Development 101. Connectathon Timeline SepNov Register Pre-connectathon testing Test evaluation Config entry Connectathon!AugOctDecJan."— Presentation transcript:

1 Connectathon Test Development 101

2 Connectathon Timeline SepNov Register Pre-connectathon testing Test evaluation Config entry Connectathon!AugOctDecJan

3 Typical Actor/Transaction Diagram …for an “Integration-type IHE Profile

4 Typical Actor Diagram …for an “Content-type IHE Profile Content Creator Content Consumer

5 Types of Tests 1.Pre-Connectathon Tests –Focus is on contents of a message (or document) Tool-based testing -- sending/receiving message Sample exchange (eg document, DICOM image) (Also: Internet testing) 2.Connectathon Test –Focus is on exchange of data between partners and the expected outcome No peer test Peer-to-peer test Group (full workflow)

6 Example scope of pre-connectathon test Tool

7 Example scope of a peer-to-peer connectathon test

8 Content Creator Content Consumer Example scope of a pre-connectathon “content” test Content checked by Tool

9 Content Creator Content Consumer Example scope of a peer-to-peer connectathon “content” test Could be IHE transport…or gazelle as intermediary

10 Structure of a Connectathon Test 1.Overview containing 3 sections –Special Instructions –Description –Evaluation 2.Actors involved in the test (aka Roles) 3.Test Steps

11 How do vendors know which tests to do? Tests are assigned based on Profile/Actor/Options chosen during registrationTests are assigned based on Profile/Actor/Options chosen during registration Matrix of tests per profile: Connectathon  Manage test requirementsMatrix of tests per profile: Connectathon  Manage test requirements Pre-Connectathon to do list: Connectathon  Pre-Connectathon TestingPre-Connectathon to do list: Connectathon  Pre-Connectathon Testing Connectathon to do list: Connectathon  ConnectathonConnectathon to do list: Connectathon  Connectathon

12


Download ppt "Connectathon Test Development 101. Connectathon Timeline SepNov Register Pre-connectathon testing Test evaluation Config entry Connectathon!AugOctDecJan."

Similar presentations


Ads by Google