1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa.

Similar presentations


Presentation on theme: "1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa."— Presentation transcript:

1 1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

2 o Privately owned company o Founded in 1982 o Headquarters in Sliedrecht o Branch offices : o Sliedrecht (NL) o Antwerp (B) o Brussels (B) o Basel (CH) o Strasbourg (F) o Ottmarsheim (F) o Lille (F) o Number of employees : 140 o Danser owned vessels: 4 o Danser chartered vessels: 60 o Transported in 2013: > 1,0 million TEU Company profile 2 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

3 Operating Area 3 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

4 “ Eiger-Nordwand” Built 2000 Overall lenght177 meter Width11,45 meter Draft2,56 meter Tonnage5300 tonnes Capacity (4 layers) 348 TEU Engines 2x 900 kW Vessel particulars 1st LNG Refit on Inland Vessel 4 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

5 Project Targets Meet customer demand; green transportation Meet upcoming legislation by ports and governments Meet Danser Group strategy: Frontrunner in clean & safe transportation Emission meeting (expected) CCR4 requirements Pilot for LNG refit on 4 more container vessels How: Installation Dual-Fuel propulsion system (Wärtsilä Engine, Tank/ Coldbox) Increased performance; fully redundant Safety leading parameter in overall design 5 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

6 REFIT Arrangement Proven design of all major components, based on multiple years of experience Dual-Fuel Engine: automatic switch over to gasoil in case of failure/ alarm Dual-Fuel Engine: designed for LNG as main fuel (minimum 95%) Dual-Fuel Engine with a/o double wall piping; gas safe Machinery Room ! Gas detection and auto shut down of main LNG valve Double redundant ventilation Trained crew & management 6 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

7 Project Summery Feb 2012 Jun 2012 July 2012 Dec 2012 Feb 2013 Mar 2013 Aug 2013 Sept 2013 Oct 2013 Feb 2014 Apr 2014 Jun 2014 Jul 2014 Start project, initial discussions Conceptual design by project team Presentation to LRoS Introduction to Ministery of Infrastructure (IL&T, I&M) Submission call for TEN-T project Start detailed design Presentation at ADN meeting in Geneve Presentation at CCR meeting in Strasbourg HAZID study by LROS Recommendation of CCR is recieved Start refit Tests, commissioning & trials Refitted ship started its normal operations 7 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

8 Reflecting current operations Between 20-25% reduction on fuel costs 95-99% LNG Building up confidence of crew on “working with” – “sailing on” LNG Less noise generation Bunkering time reduced to 3 hours 8 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

9 THANK YOU QUESTIONS ? www.danser.nl 9 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa