1 Database Readiness Workshop Summary Dirk Duellmann, CERN IT For the LCG 3D project http://lcg3d.cern.chhttp://lcg3d.cern.ch SC4 / pilot WLCG Service Workshop 11th February, Mumbai

2 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann2 Why a LCG Database Deployment Project? LCG today provides an infrastructure for distributed access to file based data and file replication Physics applications (and grid services) require a similar services for data stored in relational databases –Several applications and services already use RDBMS –Several sites have already experience in providing RDBMS services Goals for common project as part of LCG –increase the availability and scalability of LCG and experiment components –allow applications to access data in a consistent, location independent way –allow to connect existing db services via data replication mechanisms –simplify a shared deployment and administration of this infrastructure during 24 x 7 operation Scope set by PEB – Online - Offline - Tier sites

3 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann3 3D Participants and Responsibilities LCG 3D is a joint project between –Service users: experiments and grid s/w projects –Service providers: LCG tier sites including CERN Project itself has (as all projects) limited resources (2 FTE) –Mainly coordinating requirement discussions, testbed and production configuration, setup and support –Rely on experiments/projects to define and validate their application function and requirements –Rely on sites for local implementation and deployment of testbed and production setup

4 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann4 LCG 3D Service Architecture T2 - local db cache -subset data -only local service M O O O M T1- db back bone - all data replicated - reliable service T0 - autonomous reliable service Oracle Streams http cache (SQUID) Cross DB copy & MySQL/SQLight Files O Online DB -autonomous reliable service -Pit or CERN CC F S S SS

5 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann5 Online-Offline Connection A well-documented schema was reported at the last LCG3D Workshop Artwork by Richard Hawkings Slide : A. Vaniachine

6 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann6

7 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann7

8 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann8 LCG Database Deployment Plan After October ‘05 workshop a database deployment plan has been presented to LCG GDB and MB –http://agenda.cern.ch/fullAgenda.php?ida=a057112 Two production phases March - Sept ‘06 : partial production service –Production service (parallel to existing testbed) –H/W requirements defined by experiments/projects –Based on Oracle 10gR2 –Subset of LCG tier 1 sites: ASCC, CERN, BNL, CNAF, GridKA, IN2P3, RAL Sept ‘06- onwards : full production service –Adjusted h/w requirements (defined at summer ‘06 workshop) –Other tier 1 sites joined in: PIC, NIKHEF, NDG, TRIUMF

9 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann9 Proposed Tier 1 Hardware Setup Propose to setup for first 6 month –2/3 dual-cpu database nodes with 2GB or more Setup as RAC cluster (preferably) per experiment ATLAS: 3 nodes with 300GB storage (after mirroring) LHCb: 2 nodes with 100GB storage (after mirroring) Shared storage (eg FibreChannel) proposed to allow for clustering –2-3 dual-cpu Squid nodes with 1GB or more Squid s/w packaged by CMS will be provided by 3D 100GB storage per node Need to clarify service responsibility (DB or admin team?) Target s/w release: Oracle 10gR2 –RedHat Enterprise Server to insure Oracle support

10 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann10 DB Readiness Workshop last Monday http://agenda.cern.ch/fullAgenda.php?ida=a058495 Readiness of the production services at T0/T1 –status reports from tier 0 and tier 1 sites –technical problems with the proposed setup (RAC clusters)? –open questions from sites to experiments? Readiness of experiment (and grid) database applications –Application list, code release, data model and deployment schedule –Successful validation at T0 and (if required T1)? –Any new deployment problems seen by experiment users which need a service change Review site/experiment milestones from the database project plan –(Re-)align with other work plans - eg experiment challenges, SC4

11 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann11 T0 Database Service Evolution Until summer 2005 –Solaris based shared Physics DB cluster (2-nodes for HA) Low CPU power, hard to extend, shared by all experiments –(many) linux disk servers as DB servers High maintenance load, no resource sharing, no redundancy Now consolidation on extensible database clusters –No sharing across experiments –Higher quality building blocks Midrange PCs (RedHat ES) FibreChannel attached disk arrays As of last month - all LHC services moved Slide : Maria Girone

12 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann12 Service Throttling - Resource Usage Reports Run into degraded service after single remote user submitted many (idle) jobs –Defined account profile for larger apps Db accounts are shared among many users –Switched on idle session “sniping” (default = 3h idle time) Producing weekly resource overviews to experiment database coordinator –Allow experiment to prioritize resources and identify unexpected usage patterns –Which jobs/users got affected by what limit? Slide : Maria Girone

13 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann13 CERN Hardware evolution for 2006 Current State ALICEATLASCMSLHCbGrid3DNon-LHCValidation - 2-node offline 2-node -- 2x2-node 2-node online test Pilot on disk server Proposed structure in Q2 2006 2-node4-node 4--node2-node2-node (PDB replacement) 2-node valid/test 2-node pilot Compass?? Online? Linear ramp-up budgeted for hardware resources in 2006-2008 Planning next major service extension for Q3 this year Slide : Maria Girone

14 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann14 CERN RAC Expansion for Q2 New mid-range servers received and installed –Passed acceptance tests by IT-FIO Waiting for additional disk-arrays and fibre channel switches –Expect delivery end of February Planning the setting up in collaboration with IT-FIO Proceed in two steps –February: Extension of existing RACs with additional CPUs Cabling work for fibre channel and IP networks has started –March: Creation of new RACs eg dedicated experiment validation servers after disk-arrays and switches arrived Slide : Maria Girone

15 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann15 Tier 0 preps Database Service extension going according to schedule –Resource prioritization and extension planning needs experiment involvement (and real deployment experience) –Significant lead time for h/w orders - need experiment / project requests early! Also Streams and Frontier setups proceeding well –New downstream capture proposal under test - seems promising to avoid some couplings observed in the test bed during site problems Need production setup for Database Monitoring (Oracle Grid Control 10gR2) –Tier 1s may use another local grid control instance –Two agents reporting into common 3D and local Grid Control

16 Gordon D. Brown e-Science, RAL SC4 / pilot WLCG Service Workshop, 11th February, Mumbai 16 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann 16 3D Database Hardware Structure

17 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann17

18 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann18 Tier 1 Progress Sites largely on schedule for a service start end of March –h/w either installed already (BNL, CNAF, IN2P3) or expect delivery of order shortly (GridKA, RAL) –Some problems with Oracle Clusters technology encountered and solved! –Active participation from sites - DBA community building up First DBA meeting focusing on RAC installation, setup and monitoring hosted by Rutherford scheduled for second half of March Need to involve remaining Tier 1 sites now –Establishing contact to PIC, NIKHEF, NSG, TRIUMF to follow workshops, email and meetings

19 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann19 Service Issues Oracle Issues –X.509(proxy) certificates - will they be supported by Oracle? –s/w and support licenses for Tier 1 –instant client distribution within LCG –With commercial Oracle contact (IT-DES group) and IT license officer Application Server support During initial phase (March-Sept) CMS proposed to support tomcat/frontier/squid setup Will discuss other experiments requirements

20 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann20 Databases in Middleware & Castor Took place already for services used in SC3 –Existing setups at the sites –Existing experience with SC workloads -> extrapolate to real production LFC, FTS - Tier 0 and above –Low volume, but high availability requirements –CERN: Run on 2-node Oracle cluster; outside single box Oracle or MySQL CASTOR 2 - CERN and some T1 sites –Need to understand scaling up to LHC production rates –CERN: Run on 3 Oracle servers Currently not driving the requirements for the database service Need to consolidate databases configs and procedures –may reduce effort/diversity at CERN and Tier 1 sites

21 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann21 LCG Application s/w Status COOL and POOL have released versions based on CORAL –Includes re-try and failover required for reliable db service use These features need be tested for experiment –POOL includes production version FroNTier plug-in Control of SQUID caching may still be required to implement more realistic caching policies –These releases (or bug fixes) are target for 2006 deployment LCG s/w expected to be stable by end of February for distributed deployment as part of SC4 or experiment challenges Caveats: –COOL still has important functionality items on the development plan for this year –Conditions schema stability will need careful planning for COOL and FroNTier

22 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann22 Experiment Applications Status Conditions - Driving the database service size at T0 and T1 –EventTAGs (may become significant - need replication tests and concrete experiment deployment models) Framework integration and DB workload generators exist –successfully tested in various COOL and POOL/FroNTier tests –T0 performance and replication tests (T0->T1) looks ok Conditions: Online -> Offline replication only starting now –May need additional emphasis for online tests to avoid surprises –CMS and ATLAS are executing online test plans Progress in defining concrete conditions data models –CMS showed most complete picture (for Magnet Test) –Still quite some uncertainty about volumes, numbers of clients

23 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann23 Test Status : 3D testbed Replication test in progress –Offline->T1: COOL ATLAS : Stefan Stonjek (CERN, RAL, Oxford) COOL LHCb : Marco Clemencic (CERN, RAL, GridKA?) FroNtier CMS : Lee Lueking (CERN and several t1/t2 sites) ARDA AMGA: Birger Koblitz (CERN->CERN) AMI : Solveig Albrandt (IN2P3->CERN) –Online->offline: CMS Conditions : Saima Iqbal (functional testing) ATLAS : (Gancho Dimitrov) Server setup, networking config with pit network LHCb : planning with LHCb online Coordination during weekly 3D meetings –Status: successful functional test - ramping up volume/load

24 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann24

25 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann25

26 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann26 Summary Database Production Service and Schedule defined (unchanged since GDB/MB approval) –Phase 1 - end of March: ASCC, BNL, CERN, CNAF, IN2P3, RAL –Full deployment - end of September: PIC, NIKHEF, NDG, TRIUMF Consolidation with grid service oracle setups Setup progressing on schedule at tier 0 and 1 sites Application performance tests progressing First larger scale conditions replication tests with promising results for streams and frontier technologies Concrete conditions data models still missing for key detectors

27 SC4 / pilot WLCG Service Workshop, 11th February, Mumbai Dirk Duellmann27 “My Conclusions” There is little reason to believe that a distributed database service will move into stable production any quicker than any of the other grid services Should start now with larger scale production operation to resolve the unavoidable deployment issues Need the cooperation of experiments and sites to make sure that concrete requests can be quickly validated against a concrete distributed service