Presentation is loading. Please wait.

Presentation is loading. Please wait.

SAF 2010 OAS Program-Budget Summary and Supplementary Data August 25, 2009.

Similar presentations


Presentation on theme: "SAF 2010 OAS Program-Budget Summary and Supplementary Data August 25, 2009."— Presentation transcript:

1 SAF 2010 OAS Program-Budget Summary and Supplementary Data August 25, 2009

2 2 Table of Contents Pages I.2010 Proposed Program-Budget3 – 13 II.Allocation by “Pillars”14 - 17 III.Organizational Charts18 - 21 IV.Going Forward: Key Issues22 - 23 V.Supporting Tables24 - 35

3 3 SAF/DBFS/DPF I. 2010 Proposed Program-Budget

4 4 Proposed Global Budget Level The combined Proposal represents a 4% decline from the 2009 level due primarily to anticipated lower contributions for the Specific Funds. Proposed Regular and Voluntary (FEMCIDI) Funds appropriation levels for 2010 will remain at the 2009 approved levels. Specific Fund contributions are projected at $81.9 million, versus $90.0 million in 2009.

5 5 Proposed Regular Fund Budget Appropriation Levels (AG/Res. 1 (XXXVI – E/08) In order to limit the 2010 Regular Fund Budget to 2009 levels, while absorbing anticipated statutory (e.g. COLA) and inflationary pressures, the GS/OAS made a number of key assumptions:

6 6 Inflation and related COLA adjustments in 2010 are projected at 1% over the 2009 levels. These minor projected increases are absorbed within the $90.1 million ceiling. The number of posts to be financed by the Regular Fund in 2010 is reduced by 13 (from the 2009 level of 547) in order to accommodate COLA and other personnel costs within the Object 1 ceiling of $58.0 million. Non-personnel (Objects 2 - 9) are also capped at 2009 levels. No provision for urgent building repairs or capital investments are included in the 2010 Regular Fund budget proposal. These are being addressed under a separate request (see CP/CAAP/INF. 23/09).CP/CAAP/INF. 23/09 Proposed Regular Fund Budget Key Assumptions

7 7 The Regular Fund budget proposal does not contain provisions for Main Building centennial celebrations, special General Assemblies or other extraordinary events. Proposed Regular Fund Budget Key Assumptions (cont.)

8 8 2010 proposed Regular Fund budget is $20.2 million below the comparable 2001 budget in real terms. Proposed Regular Fund Budget Regular Fund Authorized Budget Ceilings for 2001 - 2010 versus Hypothetical Inflation-Adjusted Budget Ceilings (in millions) Proposed

9 9 Had the 2001 appropriation level kept pace with inflation, the 2010 Regular Fund appropriation would have been set at $110.3 million. If the 2010 budget proposal were to fully address current requirements (not taking into account capital improvement needs) the budget ceiling would be in the vicinity of $97 million. With only a modest increase of 3% maintaining the recent trajectory the budget ceiling would be $92.8 million. Proposed Regular Fund Budget

10 10 Proposed The 2010 Proposal eliminates 13 posts financed with Regular Fund resources. Proposed Regular Fund Budget Number of Posts financed by the Regular Fund Budget

11 11 Proposed Regular Fund Budget Financing (in millions)

12 12 Proposed Regular Fund Budget Regular Fund Authorized Quota Levels for 2001 - 2010 versus Hypothetical Inflation-Adjusted Quota Assessments (in millions) The 2010 proposed Regular Fund quota assessments are $13.1 million below the comparable 2001 assessments, in real terms.

13 13 Proposed Regular Fund Budget Reserve Subfund Projections (in thousands)

14 14 SAF/DBFS/DPF II. Allocation to Areas by “Pillars”

15 15 Allocations to Areas (“Pillars”)

16 16 Allocations to Areas (“Pillars”) (cont.) “Relative Participation Specific Funds/Regular Funds” represents the ratio of Specific Funds dollars for every dollar allocated from Regular Fund resources. For example, for every dollar of the Regular Fund, the Democracy and Governance pillar receives $3.30 in Specific Funds.

17 17 Allocations to Areas (“Pillars”) (cont.)

18 18 SAF/DBFS/DPF III. Organizational Structure

19 19 Current 2009 Organizational Structure

20 20 Proposed 2010 Organizational Structure

21 21 Proposed Organizational Changes

22 22 SAF/DBFS/DPF IV. Going Forward: Key Issues

23 23 Approval of the 2010 Expenditure Budget Financing of the 2010 Regular Fund Budget Reserve Subfund 2011 Program-Budget: Implications of the 2010 Regular Fund budget decisions and guidance for the General Assembly and the GS/OAS on 2011 budget ceiling and financing Urgent building repairs or capital investment requirements Going Forward: Key Issues

24 24 SAF/DBFS/DPF V. Supporting Tables

25 25 2010 Regular Fund Summary by Program (Chapter)

26 26 2010 Regular Fund Summary by Program (Chapter) Program 1: Office of the Secretary General

27 27 2010 Regular Fund Summary by Program (Chapter) Program 2: Office of the Assistant Secretary General

28 28 2010 Regular Fund Summary by Program (Chapter) Program 3: Autonomous and/or Decentralized Entities

29 29 2010 Regular Fund Summary by Program (Chapter) Program 4: Secretariat for Legal Affairs

30 30 2010 Regular Fund Summary by Program (Chapter) Program 5: Secretariat for Multidimensional Security

31 31 2010 Regular Fund Summary by Program (Chapter) Program 6: Secretariat for Political Affairs

32 32 2010 Regular Fund Summary by Program (Chapter) Program 7: Executive Secretariat for Integral Development

33 33 2010 Regular Fund Summary by Program (Chapter) Program 8: Secretariat for External Relations

34 34 2010 Regular Fund Summary by Program (Chapter) Program 9: Secretariat for Administration and Finance

35 35 2010 Regular Fund Summary by Program (Chapter) Program 10: Basic Infrastructure and Common Costs CP22812E


Download ppt "SAF 2010 OAS Program-Budget Summary and Supplementary Data August 25, 2009."

Similar presentations


Ads by Google