Presentation is loading. Please wait.

Presentation is loading. Please wait.

Score Sheet The BEAD-BOX GAME tm Note: Production Lot Size 50 Beads Per Operator Per Day Inspector (1) ___________________ Recorder: ___________________.

Similar presentations


Presentation on theme: "Score Sheet The BEAD-BOX GAME tm Note: Production Lot Size 50 Beads Per Operator Per Day Inspector (1) ___________________ Recorder: ___________________."— Presentation transcript:

1 Score Sheet The BEAD-BOX GAME tm Note: Production Lot Size 50 Beads Per Operator Per Day Inspector (1) ___________________ Recorder: ___________________ Inspector (2) ___________________ Supervisor: __________________ Chief Inspector: _________________ Production Mgr:: ______________ Customer: ______________________ Plant Mgr:: __________________ Trademarks and copyright (C) 1994, Michael Arthur Johnson -- Page 43

2 WORKERS IN THE “RED BEAD FACTORY” 6 WILLING WORKERS. Must be willing to put forth best effort. Continuation of job depends on performance 2 INSPECTORS. Experience not necessary. Inspector must be able to distinguish RED from WHITE. Must be able to count to 20. 1 CHIEF INSPECTOR. Same requirements as for inspector. 1 RECORDER. Must be able to write and add.

3 The Fourteen Obligations of Top Management 1. Create constancy of purpose for improvement of product and service. 2. Adopt the new philosophy. 3. Cease dependence on inspection to achieve quality. 4. End the practice of awarding business on the basis of price tag alone. Instead, minimize total cost by working with a single supplier. 5. Improve constantly and forever every process for planning, production, and service. 6. Institute training on the job. 7. Adopt and institute leadership. 8. Drive out fear. 9. Break down barriers between staff areas. 10. Eliminate slogans, exhortations, and targets for the work force. 11. Eliminate numerical quotas for the work force and numerical goals for management. 12. Remove barriers that rob people of pride of workmanship. Eliminate the annual rating or merit system. 13. Institute a vigorous program of education and self-improvement for everyone. 14. Put everybody in the company to work to accomplish the transformation. Dr. W. Edwards Deming


Download ppt "Score Sheet The BEAD-BOX GAME tm Note: Production Lot Size 50 Beads Per Operator Per Day Inspector (1) ___________________ Recorder: ___________________."

Similar presentations


Ads by Google