Presentation is loading. Please wait.

Presentation is loading. Please wait.

Transition Process (reading)  Airfield Technical Advisor  NIAL started early – problems with forms  Download documentation off CAA website  CAA.co.uk/

Similar presentations


Presentation on theme: "Transition Process (reading)  Airfield Technical Advisor  NIAL started early – problems with forms  Download documentation off CAA website  CAA.co.uk/"— Presentation transcript:

1 Transition Process (reading)  Airfield Technical Advisor  NIAL started early – problems with forms  Download documentation off CAA website  CAA.co.uk/ airports/ EASA/ EASA aerodromes  Links to EASA regulations  Commission Regulation (Implementing rule)  AMC/ GM (Operational basis)  Certification Specification/ GM (Certification basis)

2 Transition Process

3  Links to CAA transition paperwork  Aerodrome Manual Checklist  Certification Basis.  Operational Basis.  Declaration of Compliance

4 Transition Process  Risks  Staff salaries - unionised  OJEC – fuel committee  Additional insurance costs?

5 Transition Process(suggest)  Aerodrome Manual 1st  Certification Basis  Operational Basis  No = mitigation by ELOS, ALTMOC, SC  Risk log as supporting evidence  DAAD  Support from CAA Transition Team  Guidance after submission

6 Transition Process (examples)  Taxiway shoulders (ELOS)  (DAAD)  ATC Tower Height (SC)  (removed)  Timescale (notification  completion)

7 Transition Process (Docs)  Aerodrome Manual & Checklist  Certification Basis  Operational Basis  Risk Log (if applicable)  Declaration (Accountable Manager)


Download ppt "Transition Process (reading)  Airfield Technical Advisor  NIAL started early – problems with forms  Download documentation off CAA website  CAA.co.uk/"

Similar presentations


Ads by Google