Presentation is loading. Please wait.

Presentation is loading. Please wait.

 Client: Dr. Erik Eddy › CEO of TEAMS 101  Guest: Dr. Meg Fryling  Guest: Dr. Darren Lim.

Similar presentations


Presentation on theme: " Client: Dr. Erik Eddy › CEO of TEAMS 101  Guest: Dr. Meg Fryling  Guest: Dr. Darren Lim."— Presentation transcript:

1

2  Client: Dr. Erik Eddy › CEO of TEAMS 101  Guest: Dr. Meg Fryling  Guest: Dr. Darren Lim

3 Introduction Problem Definition System Justification System Goals System Constraints Resources Development Model Timeline

4

5 Introduction Problem Definition System Justification System Goals System Constraints Resources Development Model Timeline

6  Client: Dr. Erik Eddy  Team Evaluation: Application on the TEAMS 101 Portal › Currently no website for teammates to provide group evaluations › Groups only provide feedback after project has terminated

7  Allows teammates to alter work ethic/behavior throughout project  Better teammate evaluation grade  Professor is more aware of team dynamic  Easy to access, small time commitment

8 Introduction Problem Definition System Justification System Goals System Constraints Resources Development Model Timeline

9  Web based software  Easy student login  Dual-view administrator account  Work in tandem with Siena email  Update Blackboard

10 Introduction Problem Definition System Justification System Goals System Constraints Resources Development Model Timeline

11  Access to Blackboard  Student login  Accessibility on mobile device

12 Introduction Problem Definition System Justification System Goals System Constraints Resources Development Model Timeline

13  Software › Chrome, Safari, Firefox, Internet Explorer, Eclipse  Servers › Oracle SQL  Operating Systems › Mac OS X, Windows  Client › Dr. Erik Eddy

14 Introduction Problem Definition System Justification System Goals System Constraints Resources Development Model Timeline

15

16 Introduction Problem Definition System Justification System Goals System Constraints Resources Development Model Timeline

17  Software Plan – September 19 th  Team Website – September 30 th  Data Dictionary – November 10 th  Software Testing Strategies – November 13 th  Design Documents – November 26 th  Preliminary Design – December 2 nd

18

19 Questions?


Download ppt " Client: Dr. Erik Eddy › CEO of TEAMS 101  Guest: Dr. Meg Fryling  Guest: Dr. Darren Lim."

Similar presentations


Ads by Google