Presentation is loading. Please wait.

Presentation is loading. Please wait.

Previous Week’s Goals Status Goal Status Narrow down materials through 98% Complete testing (all) Continue to learn Inventor In Process TestingIn Process.

Similar presentations


Presentation on theme: "Previous Week’s Goals Status Goal Status Narrow down materials through 98% Complete testing (all) Continue to learn Inventor In Process TestingIn Process."— Presentation transcript:

1 Previous Week’s Goals Status Goal Status Narrow down materials through 98% Complete testing (all) Continue to learn Inventor In Process TestingIn Process

2 Design Analysis/Testing Results From Testing  Back wall set to 4.5”  Gap between rollers at 5.25”  Plastic wheel rollers show the most promise

3 Prototypes Proto-type # 3 Adjustments leading up to prototype 4  Angles within grabber  Materials on rollers  Power supplied

4 Prototypes Grip Tape Roller Rubber Bike Tube Roller Plastic Wheel Roller

5 Manufacturing & Assembly Bevel gear proof of concept Polycarbonate guardsTroy tapping holes

6 CAD/Drawings Angled Main Rollers Assembly Alternative View

7 CAD/Drawings

8 Next Week: Goals Ongoing- Continue to machine parts for the final grabber design(All) Thursday- finished practice roller assembly (All) Continue to learn inventor (Mr. Fox)

9 Questions?


Download ppt "Previous Week’s Goals Status Goal Status Narrow down materials through 98% Complete testing (all) Continue to learn Inventor In Process TestingIn Process."

Similar presentations


Ads by Google