Presentation is loading. Please wait.

Presentation is loading. Please wait.

WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 ASIC Building Blocks for SLHC ACEOLE Mid Term.

Similar presentations


Presentation on theme: "WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 ASIC Building Blocks for SLHC ACEOLE Mid Term."— Presentation transcript:

1 WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 ASIC Building Blocks for SLHC ACEOLE Mid Term Review 3 rd August 2010 CERN – Geneva, Switzerland Paulo Moreira Work package 2

2 WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 ACEOLE fellow (ESR – 1 st June 2009): José Pedro Cardoso Associated partner: INESC Porto / University of Porto Visiting Scientist: Dr. Jose Machado da Silva CERN: Work package leader: Paulo Moreira People

3 WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 ASIC Building Blocks for SLHC: Oscillators Industrial Communications Telecommunications Mobile/cellular/portable radio, telephone & pager Aviation Marine Navigation Instrumentation Computers Digital systems CRT displays Disk drives Modems Tagging/identification Utilities Sensors Research & Metrology Atomic clocks Instruments Astronomy & geodesy Space tracking Celestial navigation HEP accelerators/detectors Aerospace: Communications Navigation IFF Radar Sensors Guidance systems Automotive Engine control, stereo, Clock Trip computer, GPS Consumer Watches & clocks Cellular & cordless phones, pagers Radio & hi-fi equipment Color TV Cable TV systems Home computers VCR & video camera CB & amateur radio Toys & games Pacemakers Other medical devices

4 WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 1 st Secondment period: 2009/9/7 to 2010/4/1 Partner: INESC Porto, Portugal (University of Porto, Portugal) PhD in Electrical and Computer Engineering: Seminar topics Microelectronic and Microelectromechanical technologies Test and Design for Testability Digital Communications Systems 2 nd Secondment period: 2011/02/25 to 2011/07/29 Second semester of PhD studies Secondment

5 WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Dr. Jose Machado da Silva 5 th and 6 th of February 2010: “Test and Design for Testability of Analogue and Mixed-Signal Circuits” (6 H) Course notes: http://indico.cern.ch/conferenceDisplay.py?confId=78641http://indico.cern.ch/conferenceDisplay.py?confId=78641 Dr. João Canas Ferreira 25 th and 26 th 2010: “Run-Time Reconfiguration of Hardware” (6 H) Course notes: http://indico.cern.ch/conferenceDisplay.py?confId=78644http://indico.cern.ch/conferenceDisplay.py?confId=78644 Training by Associated Partners

6 WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Milestones and Deliverables Del. no. Titles of the Research Training Themes and description of deliverables and milestones Nature [1] [1] Dissemina tion level Delivery date [2] [2] Status TC21 Complete initial training courses (ASIC design, CAD tools, theory of phase-locked loops etc) n.a.6 Complete D21 Sign-off specification document for ASIC (IP block) RPublic6 Complete W2n Organize microelectronics user group @ TWEPP workshop n.a.12,24,36 Complete (1/3) M21 Tape out prototype design ready for submission ORestricted18 - D22 Completion of testing and irradiation of prototype ASIC with conference report or journal publication P + RPublic27 - M22 Tape out final ASIC design ready for submission ORestricted29 - D23 Complete testing/irradiation of final ASIC and system-level integration test. Final conference report and/or journal publication D + RPublic36 - [1] [1] The nature of the deliverable is coded as follows: R = Report, P = Prototype, D = Demonstrator, O = Other [2] [2] For research themes 1-5 the delivery dates are measured in months from the start of individual ESR contracts.


Download ppt "WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 ASIC Building Blocks for SLHC ACEOLE Mid Term."

Similar presentations


Ads by Google