Download presentation
Presentation is loading. Please wait.
Published byAllyson Constance Edwards Modified over 9 years ago
1
T-76.4115 Iteration Demo BitPlayers I1 Iteration 7.12.2005
2
T-76.4115 Iteration demo 2 Agenda Project status (15 min) achieving the goals of the iteration project metrics Work results (20 min) presenting the iteration’s results demo Used work practices (5 min)
3
T-76.4115 Iteration demo 3 Introduction to the project Topic: ContextMUPE Customer: HIIT (Helsinki Institute of Information Technology) Goal 1: Integrate MUPE (Multi-User Publishing Environment) and ContextPhone so that it is possible to use context data in MUPE applications Goal 2: Develop with ContextMUPE an application that demonstrates the use of context information. ContextPhoneMUPE Context information ContextMUPE
4
T-76.4115 Iteration demo 4 Status of the iteration’s goals Goal 1: Adding context data acquired by ContextPhone to MUPE NOT FINISHED, will be continued in Implementation II Project has started slowly Developing the architecture took a lot more time than expected to the fact that neither ContextPhone or MUPE are documented -> time wasted waiting for answers and architecture redone several times Connections work, but logic has not been incorporated in ContextMUPE. Missing parts will be done in the beginning half of Implementation II and integration testing started in the middle of Implementation II Goal 2: creating the specifications for a ContextMUPE application MOVED TO LATER Brainstorming session for what the application will be like with customer after the iteration demo Specifications will be developed during Christmas “vacation”, finalized during Implementation II iteration planning. Development of the application will go in parallel with the development of the system
5
T-76.4115 Iteration demo 5 Status of the iteration’s deliverables Project plan OK, except chapter 5.1.12 Peer testing Chapter 6.4. Implementation II Requirements document OK, some requirements further specified based on new information QA documentation QA plan ok Test cases not yet defined Use case 1 partly implemented Context data can be sent to server
6
T-76.4115 Iteration demo 6 Realization of the tasks Show status and effort distribution per task or task group More time spent on design (also a bit more effort) than expected Programming work started very late because architecture late, programming task smaller than expected No testing conducted yet (no test documentation either) Very minimal documentation (no user guides etc.) Too much time budgeted on meetings StatusRealPlanDiff(Left) Project Managementok 31h10min37h-5h50min0h DesignAlmost complete 47h35h+12h12h Programmingunfinished 84h225h-141h100h Testing & QAunfinished 6h30h-24h20h Documentingunfinished 35h50min59h-23h10min30h InfrastructureAlmost complete 33h45min26h+7h45min5h Meetingsok 59h25min84h30min-25h5min0h Studyingunfinished 48h05min55h-6h55min10h Total 345h15min551h30min-206h15min177h
7
T-76.4115 Iteration demo 7 Working hours by person Knowledge a bottle neck -> developing work not divided equally No testing done Generally project has started slowly Some group members busy with other courses/activities Tasks will be moved to Christmas vacation and I2, which was originally planned to be a lighter iteration Realized hours in I1 iterationPlan in the beginning of this iteration PPI1I2Total Hattula10h30min100h59h30min170h Kauranen56h 58h170h Kemppai25h97h48h170h Lauerma31h99h40h170h Lindstedt9h30min102h58h30min170h Saarinen6h30min97h66h30min170h Total138h30min551h330h30min1020h Latest plan PPI1I2Total Hattula10h30min75h84h30min170h Kauranen56h54h60h170h Kemppai25h46h99h170h Lauerma31h46h93h170h Lindstedt9h30min91h69h30min170h Saarinen6h30min33h130h30min170h Total138h30min345h536h30min1020h RealPlanDiff Hattula 75h100h-25h Kauranen 54h56h-2h Kemppainen 46h97h-51h Lauerma 46h99h-53h Lindstedt 91h102h-11h Saarinen 33h97h-64h Total 345h551h-206h
8
T-76.4115 Iteration demo 8 Quality assessment Only very preliminary unit testing conducted on currently existing components Check that the software compiles without critical errors Actual unit and integration testing will be conducted during I2
9
T-76.4115 Iteration demo 9 Software size in Lines of Code (LOC) Remarks lots of new functinality was implemented A lot remains to be done More through commenting and refactoring may change the size in the near future PPI1I2 Total (NCLOC + COM) 01000 Comments (COM) 0100 PPI1I2 XML-parser 0 550 Test application 0130 GUI 1000 Communication & Basic functionality 615 Total (NCLOC + COM) 02295
10
T-76.4115 Iteration demo 10 Changes to the project Division of work: Development of ContextMUPE will continue during Christmas vacation and Implementation II System can only be tested on the test phone, not possible in emulator Some unit testing can be conducted using dummy data if necessary Minor revisions to requirements The priorities of some requirements need to be discussed with the client Refining the architecture XML parser functionality needed to be added in order to get communications operating ContextPhone interface was done as Blackboard client
11
T-76.4115 Iteration demo 11 Risks What is the current situation regarding the risks? Materialized risk: Some group members have not had much time for this project New, materialized risks: Questions regarding ContextPhone and MUPE are answered slowly (stakeholders are not reachable, infosite down) -> project can not progress: All problems need to be documented (in Wiki) and questions asked IMMEDIATELY Can't find the answer to questions regarding ContextPhone and MUPE (stakeholder says he doesn’t know answer) -> project can not progress: Contact directly the developer of the system, he must have the answer. New risk: Integrating Java and Symbian based systems is not possible or is very difficult -> Project can not be carried out: Redetermine goals/scope of the project with customer.
12
T-76.4115 Iteration demo 12 Results of the iteration System architecture Architecture refined to make the best out of new information that was achieved The amount of code required was reduced from what was expected The current architecture can be implemented QA plan Testing will be done in I2 Most of the testing will have to be done on the phone Implemented use cases Use case 1 partially implemented Demonstrate the developed software There is no testable software yet – only parts of the software that are runnable separately Complete parts: Sockets, ContextHandler, MUPE parser Partially developed: Filter, Mupe Configuration, GUI
13
T-76.4115 Iteration demo 13 Architecture and status
14
T-76.4115 Iteration demo 14 Used work practices How have you been using the planned work practices, what are the experiences of mandatory practices Iterative development, iteration planning, documenting, risk management, time reporting, software size reporting, communication, iteration demo, version contro, coding convention, defect tracking. other practices Weekly meetings Problem log Design Patterns (SEPA) New practices Reflection workshop (SEPA) Agenda for meetings Refactoring (SEPA)
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.