Download presentation
Presentation is loading. Please wait.
Published byShanna Robinson Modified over 9 years ago
1
ENVIRONMENTAL SITE ASSESSMENT & THE PROJECT DEVELOPMENT PROCESS
2
ESA Project Initiation Project Path 1Path 2Path 3Path 4Path 5 ESA Project Initiation Package Preliminary Engineering, Task 1.2.C.C, if necessary Preliminary Engineering, Task 1.2.C.C Preliminary Engineering, Task 1.2.C.C
3
No ROW ESA Screening Path 1Path 2Path 3Path 4Path 5 No ROW ESA Screening Step 1 - For Engineering, Task 2.2.D - For projects with no ROW, but deep excavation, petroleum contamination only Preliminary Engineering, Task 2.2.D - For projects with no ROW, but deep excavation, petroleum contamination only N/A
4
ESA Screening Path 1Path 2Path 3Path 4Path 5 ESA Screening Preliminary Engineering, Task1.2.C.C, if necessary Preliminary Engineering, Task1.2.C.C
5
Phase I ESA Path 1Path 2Path 3Path 4Path 5 Phase I ESAN/AEnvironmental Engineering, Task 3.1.D – conducted on preferred alternative Environmental Engineering, Task 3.1.D – conducted on Feasible Alternative(s)
6
Phase II ESA Work Plan Path 1Path 2Path 3Path 4Path 5 Phase II ESA Work Plan N/A Environmental Engineering, Task 3.1.Q – Conducted on Preferred Alternative
7
Phase II ESA Path 1Path 2Path 3Path 4Path 5 Phase II ESAN/AEnvironmental Engineering, Task 3.1.Q – Conducted on Preferred Alternative
8
ODOT’S STEPPED ESA PROCESS
9
Path 1 Projects
10
Path 2 & 3 Projects
11
Paths 4 & 5
Similar presentations
© 2025 SlidePlayer.com Inc.
All rights reserved.