Presentation is loading. Please wait.

Presentation is loading. Please wait.

CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office (

Similar presentations


Presentation on theme: "CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ("— Presentation transcript:

1 CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp )JAXA.CCSDS@jaxa.jp

2 CMC, 25 Jan. 07 Page 2 JAXA CCSDS Principal Delegate and Staff members Principal DelegateJunjiro Nakahara AreaWG/BOFStaff SE AreaSpace/Ground Interoperability Architecture BOF1 staffTakahiro Yamada Delta-DOR SIG1 staffHiroshi Takeuchi MOIMS AreaNavigation WG3 staffMina Ogawa Spacecraft Monitor & Control WGYamada Takahiro Makoto Kawai CSS AreaService Management WG1 staffNobuhiro Yagi Cross Support Transfer Services WG SOIS AreaSubnetwork Services WG1 staffHiroshi Anegawa Application Support Service WG Onboard Plug & Play BOF SLS AreaRF Modulation WG2 staffMasanobu Yajima Space Link Protocols WGTakahiro Yamada High Rate Uplink WG SIS AreaCFDP Interoperability Testing WG2 staffYoshitaka Taromaru Asynchronous Message Service WGTakahiro Yamada JAXA CCSDS Secretary Office3 staffKaneaki Narita Yoshitaka Taromaru Kiyohisa Suzuki

3 CMC, 25 Jan. 07 Page 3 CCSDS Implementation Status Spacecraft  JAXA adopted AOS (including TM) and/or TC for 10 spacecrafts was launched and 5 spacecrafts will be launched in the near future.  Other Japanese organization adopted AOS and/or TC for 4 spacecrafts was launched.

4 CMC, 25 Jan. 07 Page 4 CCSDS Implementation Status Overview of SELENE  SELENE will be launched by H-IIA rocket in FY 2007. The SELenological and ENgineering Explorer "SELENE", Japan’s first large lunar explorer, will be launched by the H-IIA rocket in 2007. The major objectives of the mission are to understand the Moon’s origin and evolution, and to observe the moon in various ways in order to utilize it in the future. Main orbiter↑ ←VRAD sat. (Vstar)←Relay sat. (Rstar)

5 CMC, 25 Jan. 07 Page 5 CCSDS Implementation Status Overview of JEM  JEM will be launched by Space Shuttle in FY 2007. The Japanese Experiment Module (JEM) "KIBO," the first Japanese manned experimental facility, will be docked to the ISS in 2007. KIBO consists of two facilities. The Pressurized Module which is 11.2 metres long and 4.4 metres in diameter, will allow astronauts to work in a comfortable environment with air composition and pressure similar to Earth’s. The Exposed Facility will be a staging area for long-term experiments in open space, as well as Earth and astronomical observations. The Exposed Facility is a unique facility in that it enables astronauts to conduct experiments with direct exposure to space without any modification.

6 CMC, 25 Jan. 07 Page 6 CCSDS Implementation Status Overview of WINDS  WINDS will be launched by H-IIA rocket in FY 2007. WINDS will be launched by an H-IIA Launch Vehicle in the fiscal year 2007 to establish the world's most advanced information and telecommunications network. The WINDS project is responsible for the demonstration of the validity and usefulness of technologies related to large-capacity data communications in our space infrastructure project, "i-Space," the purpose of which is to promote the use of satellites in such fields as Internet communications, education, medicine, disaster measures and Intelligent Transport Systems.

7 CMC, 25 Jan. 07 Page 7 CCSDS Implementation Status Overview of GOSAT  GOSAT will be launched by H-IIA rocket in FY 2008. GOSAT is a satellite that aims to contribute to the Kyoto Protocol by monitoring the distribution of the density of carbon dioxide, which is one Greenhouse gas. GOSAT is scheduled to be launched in 2008 August. GOSAT will enable the precise monitoring of the density of carbon dioxide by combining global observation data sent from space with data obtained on land, and with simulation models.

8 CMC, 25 Jan. 07 Page 8 CCSDS Implementation Status Space Link Service (SLS) [Implementation]  JAXA ground network provides the Telecommand and AOS compatible capability (5 domestic stations and 4 overseas stations)  Katsuura, Masuda, Okinawa, Usuda and Uchinoura (Domestic)  Kiruna, Perth, Maspalomas and Santiago (Overseas)  Two refurbished antennas at Katsuura and Okinawa will be added to the network in FY2007. [Under studying]  As coding method, Turbo Code Decoder compliant with CCSDS standard is under studying for deep space mission.

9 CMC, 25 Jan. 07 Page 9 Katsuura [KTU1, S-band, 10m] [KTU2, S-band, 13m] Masuda [MSD1, S-band, 10m] Okinawa [OKN1, S-band, 10m] [OKN2, S-band, 18m] Usuda [UDSC, S/X-band, 64m] Uchinoura [USC, S/X-band, 34m/20m/10m] Tsukuba Space Center [TKSC] Tracking And Control Center [TACC] Maspalomas [MSP1, S-band, 10m] Santiago [SNT1, S-band, 10m] Kiruna [KRN1, S-band, 10m] Perth [PRT1, S-band, 10m] Data Relay Test Satellite [DRTS, S/Ka-band, 90.75degE] Sagamihara Space Operation Center [SSOC] JAXA Network location CCSDS Implementation Status

10 CMC, 25 Jan. 07 Page 10 CCSDS Implementation Status SLE Transfer Service  JAXA implemented SLE GW at TACC (Tracking And Control Center at Tsukuba) and SSOC (Sagamihara Space Operation Center), and these GWs are supporting LEOP and routine operations of ASTRO-F and SOLAR-B.  SLE GW at SSOC is also enabling MUSES-C and SELENE mission to utilize JPL/DSN.  JAXA started coordination with ESA on SLE connection for future emergency cross support architecture.

11 CMC, 25 Jan. 07 Page 11 CCSDS Implementation Status @ Tsukuba @ Sagamihara Usuda Deep Space Center Uchinoura Space Center GN SN DSN JPL SLE (RAF / FCLTU) MUSES-C, SELENE SLE (RAF / FCLTU) ALOS, ETS-VIII, WINDS, GOSAT,MUSES-C, ASTRO- E2, ASTRO-F, SOLAR-B, SELENE, INDEX, etc. ESA SLE GW Tracking and Control Center (TACC) Sagamihara Space Operation Center (SSOC) JAXA CCSDS S/C Under coordination SLE JAXA Internal SLE connection ESTRACK CNES

12 CMC, 25 Jan. 07 Page 12 CCSDS Implementation Status SLE Service Management  Based upon IOAG-10 discussion, JAXA started development of Service Management prototype system for interoperability test. 20072008 123456789101112123456 ~ SM Red-1 compliant prototype SM Red-2 compliant prototype Development Interoperability Test Development

13 CMC, 25 Jan. 07 Page 13 CCSDS Implementation Status MOIMS/Navigation  For SELENE mission, JAXA is implementing ODM module on Flight Dynamics System.  JAXA/ISAS VLBI staff joined Delta-DOR SIG for white book development with ESA and NASA to contribute toward standardization of Delta-DOR method and related data transfer service.


Download ppt "CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ("

Similar presentations


Ads by Google