Presentation is loading. Please wait.

Presentation is loading. Please wait.

S 1 CT2 Meeting 5-6 March 2013 Hamburg UHAM Plans 2013-2014 Kerstin Jochumsen.

Similar presentations


Presentation on theme: "S 1 CT2 Meeting 5-6 March 2013 Hamburg UHAM Plans 2013-2014 Kerstin Jochumsen."— Presentation transcript:

1 S 1 CT2 Meeting 5-6 March 2013 Hamburg UHAM Plans 2013-2014 Kerstin Jochumsen

2 Plans 2013/2014 2013 April: Poseidon cruise, Med. outflow, ADCP test array one 150 kHz and two 75 kHz instruments + Anderaa Current Meters (RCM 11) Summer: Charter cruise for servicing DS-2 – probably canceled Exchange 75 kHz at DS-2 with 150 kHz instrument? Wait for 75 kHz ADCP solution Hedinn/Steingrimur could you service DS-2? Who will help Laura deploy the Reykjanes Rige Moorings? August: Meteor cruise, upwelling filaments off Namibia (new project) 3 ADCPs needed for moorings until May 2014

3 Plans 2013/2014 Extension of Denmark Strait Array towards the Greenland Shelf

4 Plans 2013/2014 Two additional ADCP moorings on the shallower Greenland side of the Strait, one additional RCM mooring on the Icelandic side -> Input needed on the design of the frames (Svein)

5 Plans 2013/2014 2014 May: Meteor cruise off Namibia, recovery of ADCP moorings Summer: Poseidon cruise for servicing DS-2, deployment of extra DS moorings with trawl resistant frames (design of frames still open) 2015 (not yet proposed) Recovery cruise for DS moorings needed New mixing array experiment?

6 Plans 2013/2014 Poseidon cruise in 2014

7 Plans 2013/2014 ADCP deployment planning….. Exchange of DS-2 75 kHz ADCP with 150 kHz depending on RDI SNcurrentlyfrequencyApr 2013Aug 201320142015 7955HH150 kHzPoseidon testDS-2 or NamibiaDS-2 16430DS-275 kHzDS-2HH 13287HH75 kHzPoseidon testNamibiaDS-3 13288HH75 kHzPoseidon testNamibiaDS-4 13486Faroe75 kHzrecovery MayNamibia 8552Faroe75 kHzrecovery May 13175Flemish Pass75 kHz????

8 The research leading to these results has received funding from the European Union 7th Framework Programme (FP7 2007-2013), under grant agreement n.308299 NACLIM www.naclim.euwww.naclim.eu


Download ppt "S 1 CT2 Meeting 5-6 March 2013 Hamburg UHAM Plans 2013-2014 Kerstin Jochumsen."

Similar presentations


Ads by Google