Sprint 102 Review / Sprint 103 Planning March 11, 2013.

Similar presentations


Presentation on theme: "Sprint 102 Review / Sprint 103 Planning March 11, 2013."— Presentation transcript:

1 Sprint 102 Review / Sprint 103 Planning March 11, 2013

2 Sprint Resource Pages For this sprint, visit: https://developer.connectopensource.org/display/NHINPr ogress/Sprint+102 https://developer.connectopensource.org/display/NHINPr ogress/Sprint+102 For next sprint, visit: https://developer.connectopensource.org/display/NHINPr ogress/Sprint+103 https://developer.connectopensource.org/display/NHINPr ogress/Sprint+103 For information on the CONNECT 4.0 release, visit: https://developer.connectopensource.org/display/CONNE CT40/CONNECT+4.0 https://developer.connectopensource.org/display/CONNE CT40/CONNECT+4.0 2

3 Sprint 102 - Community Contributions Open forum for community members to share o Their work of the last two weeks o Their needs from CONNECT o Ideas and suggestions Community contributions o CMS - CONNECT 4.0 Alpha 1 / WebLogic WebLogic FIPS Installation Instructions o UPMC - CONNECT 4.0 Alpha 1 / WebSphere 3

4 Sprint 102 Summary - Cumulative Flow 4

5 Sprint 102 Summary - Burndown Chart 5

6 Sprint 102 Summary - Sprint Stats Points committed = 20 Pulled in 3 more points effort, totaling 23 points for sprint Attendance of HIMSS ‘13 not pointed Points remaining (unclosed) at end of sprint = 1.5 Points completed in sprint (velocity) = 6

7 Sprint 102 - Themes & Tasks Themes: HIMSS ’13 Interoperability Showcase Preparation & Attendance CONNECT 4.1 –CI and Build optimizations –Corelib optimization –Additional component technology upgrades CONNECT 4.0 Community Support (Forums, etc.) Multi-Spec DQ Investigation & Analysis ( CONN-46, CONN-15, CONN-215 ) CONN-46 CONN-15 CONN-215 7

8 Sprint 102 - What We are Showing Today HIMSS ’13 Interoperability Showcase HIMSS ’13 Interoperability Showcase Preparation & Attendance –CONN-53 - As an Exchange interoperability showcase participant. I go to a CONNECT web app, enter in my endpoints, synch up my cert, and enter in the basic demographic data about MY patients, so I can demonstrate my use of Exchange technology.CONN-53As an Exchange interoperability showcase participant. I go to a CONNECT web app, enter in my endpoints, synch up my cert, and enter in the basic demographic data about MY patients, so I can demonstrate my use of Exchange technology. –CONN-52 - As a Direct interoperability showcase participant, I want to use a CONNECT web app, to enter my direct address, and synch up my cert, so that I can demonstrate Direct.CONN-52As a Direct interoperability showcase participant, I want to use a CONNECT web app, to enter my direct address, and synch up my cert, so that I can demonstrate Direct. –CONN-231 - As a HIMSS participant, I want the CONNECT-Hub user interface to be polished and handle my errors.CONN-231 - As a HIMSS participant, I want the CONNECT-Hub user interface to be polished and handle my errors. –CONN-54 - I'm an Exchange interoperability showcase participant, I want to go to a CONNECT web app, enter in my endpoints, synch up my cert, and look up the basic demographic data from other participants, so I can exchange with them.CONN-54I'm an Exchange interoperability showcase participant, I want to go to a CONNECT web app, enter in my endpoints, synch up my cert, and look up the basic demographic data from other participants, so I can exchange with them. –CONN-136 - As an Exchange interoperability showcase participant. I need an UDDI to store Exchange addresses.CONN-136As an Exchange interoperability showcase participant. I need an UDDI to store Exchange addresses. –CONN-227 - As the FHA director, I want the CONNECT Product team to participate and demonstrate CONNECT in the HIMSS interoperability showcase, so that adopters are aware of the capabilities of CONNECT supporting Exchange/DirectCONN-227As the FHA director, I want the CONNECT Product team to participate and demonstrate CONNECT in the HIMSS interoperability showcase, so that adopters are aware of the capabilities of CONNECT supporting Exchange/Direct –CONN-140 - As the FHA director, I want CONNECT installed on a server for us use in the interoperability showcase.CONN-140As the FHA director, I want CONNECT installed on a server for us use in the interoperability showcase. –CONN-232 - As a CONNECT developer, I want to do some HIMSS13 demo dry runs, so I can be sure our demo goes smoothly.CONN-232As a CONNECT developer, I want to do some HIMSS13 demo dry runs, so I can be sure our demo goes smoothly. 8

9 Sprint 102 - What We are Showing Today HIMSS ’13 Interoperability Showcase HIMSS ’13 Interoperability Showcase Preparation & Attendance (continued) –URLs: Harness to add connection information to allow testing between CONNECT and Direct implementers - http://interop.5amsolutions.com - uid: himss; pwd: exchangehttp://interop.5amsolutions.com Updated Universal Client: http://connect.5amsolutions.com:8080/CONNECTUniversalClientGUI - test patient Cindy Winters http://connect.5amsolutions.com:8080/CONNECTUniversalClientGUI 9

10 Sprint 102 - What We are Showing Today CONNECT 4.1 CONNECT 4.1 –CONN-186 - Confirm that event logging hibernate file does not work with WAS in 4.0CONN-186Confirm that event logging hibernate file does not work with WAS in 4.0 –CONN-229 - Wrap to external testing for Direct on WL and WSCONN-229Wrap to external testing for Direct on WL and WS –CONN-84 - Remove deprecated Database codeCONN-84Remove deprecated Database code –CONN-138 - As a CONNECT adopter, I want the CONNECT validation suite to be able to run against a remote server so that CONNECT is thoroughly tested against self and other machines.CONN-138As a CONNECT adopter, I want the CONNECT validation suite to be able to run against a remote server so that CONNECT is thoroughly tested against self and other machines. –CONN-286 - regression improvements from regression suite automationCONN-286regression improvements from regression suite automation –CONN-281 - Create patientdb regression suiteCONN-281Create patientdb regression suite –CONN-230 - Install and Reconfigure CONNECT Interop Test Harness at TerremarkCONN-230Install and Reconfigure CONNECT Interop Test Harness at Terremark –CONN-188 - As a CONNECT adopter/developer, I want to Increase Cobertura coverage for Policy Engine, Aggregator, and Transform packages by at least 20% in line, method, and branch statistics so that code quality is improvedCONN-188As a CONNECT adopter/developer, I want to Increase Cobertura coverage for Policy Engine, Aggregator, and Transform packages by at least 20% in line, method, and branch statistics so that code quality is improved –CONN-74 - As a CONNECT adopter/developer I a clean property file (gateway.properties) so that there is no confusion with regards to the unused properties or default values.CONN-74As a CONNECT adopter/developer I a clean property file (gateway.properties) so that there is no confusion with regards to the unused properties or default values. –CONN-233 - As a CONNECT adopter/developer, I would like CONNECT to use liquibase for easier database management.CONN-233As a CONNECT adopter/developer, I would like CONNECT to use liquibase for easier database management. 10

11 Sprint 102 - What We are Showing Today CONNECT 4 Implementation Support CONNECT 4.0 Implementation Support –Forums + Community Support http://www.connectopensource.org/developer-resources/forums CONN-166 - Adopter reporting build problems - failing testsCONN-166Adopter reporting build problems - failing tests –Webinars NeHC Webinar (http://www.nationalehealth.org/CONNECT)http://www.nationalehealth.org/CONNECT 11

12 Sprint 102 - What We are Showing Today Multi-Spec DQ Investigation & Analysis Multi-Spec DQ Investigation & Analysis –CONN-46 - As a CONNECT implementer supporting both versions of the eHealth Exchange specifications, I need to know what version of the spec a message is implementing, so that I can validate the incoming message.CONN-46 As a CONNECT implementer supporting both versions of the eHealth Exchange specifications, I need to know what version of the spec a message is implementing, so that I can validate the incoming message. –CONN-15 – As a CONNECT implementer, I want to instruct the gateway which spec version/endpoint to target for a service so that I have greater flexibility when exchanging with my trading partners.CONN-15 As a CONNECT implementer, I want to instruct the gateway which spec version/endpoint to target for a service so that I have greater flexibility when exchanging with my trading partners. –CONN-215 - As a CONNECT adopter, I need to understand how fanning out requests to multiple communities is handled with the multi-specification implementation in CONNECTCONN-215 As a CONNECT adopter, I need to understand how fanning out requests to multiple communities is handled with the multi-specification implementation in CONNECT –CONN-293 - As a CONNECT developer, I want to research design options related to determining what version of the spec an incoming message is implementing to support partner usecase(CONN-46)CONN-293As a CONNECT developer, I want to research design options related to determining what version of the spec an incoming message is implementing to support partner usecase(CONN-46) –CONN-296 - As a CONNECT developer, I want to research design options related to instructing the gateway which spec version/endpoint to target for a service inorder to support partner use case(CONN-15)CONN-296As a CONNECT developer, I want to research design options related to instructing the gateway which spec version/endpoint to target for a service inorder to support partner use case(CONN-15) 12

13 Sprint 103 - Proposed Themes 4.0 Partner and Community Support –SSA 4.0 install on WAS –CMS-CCSQ 4.0 install on WL 11g or 12c –CMS-OFM 4.0 install on WAS 7 JDK 1.7 –Respond to IHS re the Direct ticket (CONN-279) –Community support through forum responses and guidance 4.1 Enhancements –Multi Spec QD/ RD End point enhancement for DoD/SSA (pending DE&I approval) –Installation improvements through community engagement –Continued development of a robust CI and automated test environment –JBoss - (CONN-25) in the Ordered features list Product Backlog https://issues.connectopensource.org/secure/VersionBoard.jspa?selectedProjectId=1014 0 13

14 CONNECT 4.0 Community Announcements CONNECT Awareness –Open sprint review and planning meetings  Next sprint meeting will be Mar 25 th –CONNECT 4.0 Blogs and Forum posts –CONNECT 4.0 user group meeting being planned for May 13 th at George Washington University 14

15 Questions and Discussion 15