Presentation is loading. Please wait.

Presentation is loading. Please wait.

Lance VandenBoogart GOES-R PG All Hands Meeting 5/5/2014.

Similar presentations


Presentation on theme: "Lance VandenBoogart GOES-R PG All Hands Meeting 5/5/2014."— Presentation transcript:

1 Lance VandenBoogart GOES-R PG All Hands Meeting 5/5/2014

2 Highlights Since Last Time Completed DLOC Completed DLOC WDTB core course for NWS forecasters WDTB core course for NWS forecasters Warning operations “driver’s license” Warning operations “driver’s license” Documented points for potential for GOES-R incorporation Documented points for potential for GOES-R incorporation AWIPS-2 AWIPS-2 System up and running at WDTB System up and running at WDTB Completed variance training Completed variance training

3 Satellite Liaison Twitter Account Satellite Liaison Twitter Account Auto-tweets new blog posts Auto-tweets new blog posts Shameless plug #2: please follow @SatLiaisons Shameless plug #2: please follow @SatLiaisons Highlights Since Last Time Revamped the Satellite Liaison Blog Revamped the Satellite Liaison Blog Formerly known as the “National Centers Perspective” blog Formerly known as the “National Centers Perspective” blog Re-energized as a place where we all liaisons share perspectives from our respective PGs Re-energized as a place where we all liaisons share perspectives from our respective PGs satelliteliaisonblog.wordpress.com satelliteliaisonblog.wordpress.com

4 Coming Attractions Taking AWOC Severe Taking AWOC Severe WDTB course aimed at advanced warning decision making WDTB course aimed at advanced warning decision making Noting potential GOES-R applications Noting potential GOES-R applications Continue Training Material Review Continue Training Material Review Finished SHyMet course (9 modules) Finished SHyMet course (9 modules) COMET (1 of 6 suggested complete) COMET (1 of 6 suggested complete) Cooperative institute product-specific training Cooperative institute product-specific training AWIPS-2 AWIPS-2 Working on local menu setup and archiving capability for future GOES-R simulation creation Working on local menu setup and archiving capability for future GOES-R simulation creation

5 Coming Attractions “Tales from the Testbed” R2O/O2R Webinars “Tales from the Testbed” R2O/O2R Webinars Part of the Hazardous Weather Testbed (HWT) Experimental Warning Program (EWP) Part of the Hazardous Weather Testbed (HWT) Experimental Warning Program (EWP) Forecasters share with peers how they used GOES-R proxy products Forecasters share with peers how they used GOES-R proxy products @1700 UTC May 9, 16, 23, Jun 6 @1700 UTC May 9, 16, 23, Jun 6 Keep eyes peeled for email to PG all hands list for details Keep eyes peeled for email to PG all hands list for details


Download ppt "Lance VandenBoogart GOES-R PG All Hands Meeting 5/5/2014."

Similar presentations


Ads by Google