Download presentation
Presentation is loading. Please wait.
Published bySharleen Gallagher Modified over 9 years ago
1
INDE 6335 ENGINEERING ADMINISTRATION SURVEY DESIGN Dr. Christopher A. Chung Dept. of Industrial Engineering
2
AGENDA l Item Remainder Analysis l Multiple Linear Regression
3
DESIGNING THE SURVEY MAJOR STEPS Define Constructs Design Scale Pilot Test Administration Item Analysis Validation & Analysis
4
PILOT TEST l Comprehension l Test reliability n Item remainder analysis...
5
ITEM ANALYSIS l How well does each item relate to the construct l Tools n Item remainder correlation n Cronbach Alpha l Resources n Excel
6
ITEM REMAINDER COEFFICIENT l How well does each item correlate with the sum of the remaining items l Pearson correlation coefficient
7
CRONBACH ALPHA l Measure of internal consistency of the construct l Function n Item intercorrelation (item remainder coefficient) n Number of items in construct l If alpha is high n Items reflect a single construct l 0.70
8
alpha = k k -1 s - s s 2 2 2 T T I X s T 2 = Total variance of the sum of the items s I 2 = Variance of individual items k = Number of items CRONBACH ALPHA FORMULA
9
DETERMINING WHICH ITEMS TO KEEP l Use item remainder coefficient and Cronbach Alpha to identify items to keep l Want to raise alpha l Retain as many items as possible l Discard items with low correlation l Remaining items are used for constructs
10
MULTIPLE REGRESSION ANALYSIS l Determine relationship between n Multiple input variables n Single output variable l Input - Independent variables n Decision n Amount of effort spent on each type of resource l Output - dependent variable n Results n Level of success of the resulting implementation
11
MULTIPLE REGRESSION ANALYSIS STEPS l Select independent and dependent variables l Data transformation l Choosing among regression models l Check model for potential violations of assumptions
12
SELECT INDEPENDENT AND DEPENDENT VARIABLES l Constructs l Colinearity n Don't want independent variables to correlate with each other n Want to separate out the predictive effects of each variable l Correlation matrix n.9 serious problem
13
DATA TRANSFORMATION l Non-linear data may be transformed into linear data n log n ln n Equation Transformed data is fit
14
CHOOSING AMONG REGRESSION MODELS l Determine which variables are significant
15
CHECK MODEL FOR VIOLATION OF ASSUMPTIONS l Residual analysis l Non-normality n Normal Scores Plot l Heteroscedasticity n Look for patterns
16
CHECKING FOR NORMALITY Normal Scores Plot Should Be Linear Residual Convert y est to Normal Z Score Value 0
17
HETEROSCEDASTICITY Do Not Want Non-Constant Variation Y est error
18
REGRESSION RESULTS l Intercept n Artificial construct for xi=0 l Coefficients n Contribution to effect from each variable l Standard Deviation n How much variability is in the data l Significance n Coefficient divided by SD n Is the l R squared…
19
REGRESSION RESULTS l Percent of variation in the data that can be explained l Number between 0.0 and 1.0 l High r squared values support hypotheses and validate survey l For a controlled experiment r squared of 0.90 is good l For survey type analysis r squared of 0.30 is good
20
USING EXCEL Multiple Regression
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.