Presentation is loading. Please wait.

Presentation is loading. Please wait.

ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June – 1 July 2010 Mervyn Harris – ATM Business Development Manager.

Similar presentations


Presentation on theme: "ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June – 1 July 2010 Mervyn Harris – ATM Business Development Manager."— Presentation transcript:

1 ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June – 1 July 2010 Mervyn Harris – ATM Business Development Manager

2 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Agenda General Overview of SITA Challenges faced by FPL 2012 Req PENS Overview PENS & FPL2012 Technical Overview PENS Transition Programme Conclusion

3 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Who we are We are the world’s leading provider of IT business solutions and communication services for the AIR TRANSPORT INDUSTRY We are a community of over 600 airline, airport, aerospace, cargo and GDS members and over 1800 customers We are unique in delivering integrated communication and IT solutions, on a global basis, for the air transport industry We do this through a single supplier relationship We are local, globally, with a presence in 220 countries and territories over 4,000 staff worldwide 140 nationalities, speaking over 70 languages

4 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Customers the world over: a snapshot

5 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Agenda General Overview of SITA Reminder - Challenges faced by FPL 2012 Req PENS Overview PENS Evolution Technical Overview PENS Transition Programme Conclusion

6 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Challenges & Impact faced by introduction of new FPL format Challenges –Meet the implementation date of 15 th Nov 2012 –Ensure all stakeholders are supported during development –compatibility with existing & future application and infrastructure –Maintain low cost –Continuity of operations. Impact –Increase in bandwidth resulting in… Type of application you will use in the future – e.g. AMHS? The chosen infrastructure – applications & Technology

7 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. FPL 2012 Infrastructure Requirements Must be capable of supporting.. –Increased bandwidth –Different technology IP Services X.25/XoT Services Multicast Services VoIP Services Circuit Emulation Services –Various applications –Meets security standards Connectivity with various Aviation stakeholders Availability – on time 15 th Nov 2012 Maintain low cost

8 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Agenda General Overview of SITA Reminder - Challenges faced by FPL 2012 Req PENS Overview PENS & FPL2012 Technical Overview PENS Transition Programme Conclusion

9 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. What is PENS A joint EUROCONTROL ANSP led initiative to provide a common IP based network service across the European region covering voice and data communication Provides efficient support to existing services and new requirements that are emerging from future Air Traffic Management (ATM) concepts.

10 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. PENS Scope

11 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Benefits of PENS Cost savings EAD- CFMU Common procurement project – model for future Pan European projects Active contribution to CNS defragmentation SESAR enabler EUROCONTROL More cost effective than fragmented network services; Set standard for other ICAO regions Expedite future pan European services Aligns with SES Implementing Rules and industry standard services ANSPs Foundation for multi-stakeholders communications for CDM and SWIM applications Air Transport Industry SITA ATC Strategy Benefits SITA shareholders (Airlines) SITA

12 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. PENS Governance PENS Service Steering Group (PSSG) –set policy and standards –review performance. PENS User Group (PUG), provides technical, financial and administrative advice to the PSSG. PENS Management Unit (PMU), –implements policy and standards set by the PSSG, –manages the PEN Service. Network Service Provider (NSP) –Provides the PENS Service –Selected NSP is SITA

13 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Proposed Initial Deployment…

14 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. PENS Status CURRENT STATUS –CFMU Operational –PENS Contract signed EUROCONTROL for CFMU and EAD Services AENA NAVIAIR Denmark LFV Sweden LPS Slovakia Finavia Avinor NAV Portugal Hungarocontrol ENAV Crocontrol Sloveniacontrol UK NATS DFS –PENS Contracts in preparation DSNA Austrocontrol Skyguide –Letter of Intent IAA N° of ANSPs May 2011 28 EU FMTP IR 2013 42 Cost savings Governance ECAC 2015 53 ICAO EUR/NAT Cost savings ICAO Request Governance 2017 ICAO EUR border Cost savings ICAO Request Governance 64 Year Driver 15 Constraint Tod ay Group Signed Transition Pgm FMTP IR PENS Future in EUROPE

15 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Agenda General Overview of SITA Reminder - Challenges faced by FPL 2012 Req PENS Overview PENS and FPL2012 Technical Overview PENS Transition Programme Conclusion

16 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Geographic Extension – Outside Europe Option 1 –PENS Governance extended outside Europe Option 2 –Regional Network Services (RENS) ‘PENS like’ - ++ Fast deployment Regulations TBA Local Governance PENS provides scalability, reliance and stability PENS Can address the FPL2012 requirement for connectivity Note: At Present, PENS is only available to ANSP’s of the EUROCONTROL member States PSSG is responsible for considering request for inclusion in PENS Currently PENS Governance does not extend beyond member states

17 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Agenda General Overview of SITA Reminder - Challenges faced by FPL 2012 Req PENS Overview PENS & FPL 2012 Technical Overview PENS Transition Programme Conclusion

18 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. The SITA solution Design - Deployment - Reporting - Tools - Fault Management - Maintenance - Customer Care LL DSL MEA LL DSL MEA GMSNet, CFMUNet ISDN WX/WXC Legacy X.25 VSAT AirportHub MPLS Based IP VPN AO ServiceNet Legacy X.25 AO Community AFTN CommCentre OPS & DEV Servers LL / DSL AGN

19 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Resiliency, scalability, stability Critical for maintaining “Business Continuity” Proposed solution is resilient, scalable and stable –Resiliency to diversely located nodes and PoP’s –Scalable to support the forecast bandwidth requirements “Backdoor Resiliency”, –A standard SITA feature and offering –Interest shown by ANSP’s for network integration –3rd Party Network provider involvement – some complexity –Already successfully implemented for several customers

20 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Agenda General Overview of SITA Reminder - Challenges faced by FPL 2012 Req PENS Overview PENS & FPL 2012 Technical Overview PENS Transition Programme Conclusion

21 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. PENS / FPL 2010 Roll out plan - 21 25/06/200815/11/2012 ANSPs AOs ANSPs support both formats PRESENT not assured 25/06/200815/11/2012 AOs Initial PENS identification 25/06/200925/06/2010 Contract Signature PENS Transition programme Roll out FPL2012 over PENS FPL2012 roll out Plan PENS roll out Plan Potential FPL2012 over PENS roll out Plan

22 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Agenda General Overview of SITA Reminder - Challenges faced by FPL 2012 Req PENS Overview PENS & FPL 2012 Technical Overview PENS Transition Programme Conclusion

23 SITA proprietary and confidential information. ©SITA 2009 All rights reserved. Conclusion PENS is available and is widely taken up in Europe PENS potential outside Europe is acknowledged To join the PENS –Contact Email: pens@eurocontrol.int –Mr Yvan Fischer –PENS Development Manager –Email: yvan.fischer@eurocontrol.int –Sign Common Procurement Agreement (CPA) –Sign PENS Contract Join the PENS Symposium – 15/16 Sep 2010 http://www.eurocontrol.int/corporate/public/event/100915_pens _sympos.html


Download ppt "ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June – 1 July 2010 Mervyn Harris – ATM Business Development Manager."

Similar presentations


Ads by Google